Opportunity
Spokane Procureware #PW ITB 6610-26
Upriver Dam spillway gantry crane and anchor replacement
Posted
October 07, 2026
Respond By
November 03, 2026
Identifier
PW ITB 6610-26
NAICS
333923, 238190, 238110, 237990
The City of Spokane is seeking a contractor to replace the Upriver Dam spillway gantry crane and anchor. - Government buyer: City of Spokane, Water & Hydroelectric Department; Purchasing Department. The work is at Upriver Dam in Spokane, Washington. - Procurement: Fabricate and deliver a new outdoor 3-ton gantry crane and gantry anchor; remove and dispose of the existing crane; install, connect, test, and commission the replacement system; and restore the site. - The crane system calls for two 1.5-ton hoists with motorized underhung trolleys. Street Crane Co. Ltd. hoists have already been procured by the City and are to be removed from the old crane, stored, and installed on the replacement crane. The specified hoist model is ZX062-3SoLM5H5H041-LHR0001-46060U14; another attachment gives the model code as ZX062-3S0LM5H5H041-LHR0001-46060U14. - The crane design includes a bridge girder, motorized end trucks and gantry travel assemblies, controls, safety devices, and anchorage or parking clamps. Existing runway rails are ASCE 30# and the work bridge is approximately 230 feet long. - Named companies: Street Crane Co. Ltd. is the named hoist manufacturer. Mesa Associates, Inc. prepared the structural design documents; LSB Consulting provided the gantry anchor design plans. Neither is identified as the crane equipment supplier. - Notable requirements: Outdoor-rated equipment; wireless controls; safety, locking, and travel-limiting devices; a wind alarm; and owner-witnessed testing and commissioning. Evaluate the existing 480-volt, three-phase, 30-amp feeder for reuse if testing shows it is adequate. Assume existing crane coatings contain lead and include compliant handling and disposal. Structural work requires an AISC-certified fabricator, certified welders, and engineer-reviewed lift plans; verify the spillway deck capacity for maximum wheel loads. - Schedule and value: Begin work within 10 days after Notice to Proceed and meet the specified substantial-completion deadline. Preliminary planning indicates an approximately eight-month construction period. The engineer’s estimate is $800,000.
Description
The City of Spokane is seeking bids to fabricate and deliver a new gantry crane and anchor, remove and dispose of the existing gantry crane, and install the replacement crane at the Upriver Dam Spillway work bridge. The work includes installation-related activities, with project plans, technical specifications, and quality control/assurance documents provided in the attachments. A mandatory pre-bid meeting is scheduled for October 27, 2026, at Upriver Dam in Spokane, Washington. Bids are due November 3, 2026, at 11:00 AM; questions must be submitted through the project’s Clarification Tab by October 28, 2026, at 2:00 PM.