Opportunity
Oregon Buys #S-X21600-00018154
Tenas Illahee Child Care Center exterior painting, siding repairs, and gutter replacement
Posted
October 07, 2026
Respond By
October 28, 2026
Identifier
S-X21600-00018154
NAICS
238320, 238170, 238160
The Confederated Tribes of Siletz Indians is seeking a contractor to repair and repaint the Tenas Illahee Child Care Center and replace its gutters in Siletz, Oregon. - Government buyer: Confederated Tribes of Siletz Indians (CTSI), through the Tenas Illahee Child Care Center (TICCC). - OEMs and named materials: The Sherwin-Williams Company paint; Hardie trim (James Hardie Building Products). - Requested services: - Pressure-wash and repaint the main building with Sherwin-Williams paint in three colors: body, trim, and concrete-wall basket-weave design. - Replace damaged or rotten T-111 siding with Hardie trim and Z-flashing where needed; repair failed caulking. - Prime and paint seven metal posts. - Remove existing gutters, replace damaged or rotten fascia, and install painted one-piece aluminum gutters and downspouts. - Secure and slope gutters for drainage; place downspouts approximately every 30 feet or as roof design requires, use minimal joints, and add splashguards where needed, including valleys and downspouts. - Remove and dispose of debris and leave the site clean and safe. - Quantities and part numbers: Two service line items, quantity 1 each; no part numbers specified. - Notable requirements: Gutter installation must prevent leaks and standing water, direct discharge to avoid drainage problems, and comply with applicable state and local building codes. Proposals are evaluated on experience and capability, proposal quality, fees, and Indian preference.
Description
The Confederated Tribes of Siletz Indians is requesting proposals for exterior repairs to the Tenas Illahee Child Care Center main building. Work includes pressure washing and repainting the exterior, replacing damaged or rotten T-111 siding as needed, repairing failed caulking, and painting metal posts. The contractor must remove and replace the building’s gutters and damaged fascia boards, install painted aluminum gutters and downspouts, and leave the job site clean. Completion is required within 60 days after proposal acceptance and contract execution.