Opportunity

CanadaBuys #5P468-26-0192/A

Parks Canada Asset Compound Options Analysis and Site Planning

Posted

October 07, 2026

Respond By

November 03, 2026

Identifier

5P468-26-0192/A

NAICS

541330, 541310, 541320

Parks Canada Agency is seeking professional consulting services to assess a proposed asset compound at Pacific Rim National Park Reserve. - Government buyer: Parks Canada Agency, for Pacific Rim National Park Reserve; contracting office identified as National Contracting Services / National Procurement Service. Rebecca Chen is named as the contracting authority. - OEMs and vendors: No commercial OEMs, vendors, or suppliers are named. The work is for an engineering or architecture consultant. - Required services: Prepare a topographic survey plan using existing LiDAR data for about 10 acres; compare building options; complete the primary building’s life-cycle cost analysis; develop site layout alternatives; and conduct a preliminary geotechnical investigation. - Buildings under consideration: A primary building of about 7,000 sq. ft. and cold-storage building(s) totaling about 5,500 sq. ft. Primary-building options include pre-engineered steel, wood frame, and modular or prefabricated construction. Cold-storage options include pre-engineered steel, a Quonset hut, and a third option proposed by the consultant. - Analysis and design requirements: Compare construction cost, life-cycle cost, service life considering coastal conditions, construction duration, and constructability. Assess embodied carbon for the primary building, but not cold storage. The primary building is intended to achieve net-zero emissions; its energy and life-cycle cost analysis must compare four scenarios and calculate net present value over 40 years. - Site and geotechnical requirements: Provide three schematic site layouts addressing grading, access and parking, utilities, fencing and gates, amenities, and ecological considerations. Prepare a Class D cost estimate and schedule for the selected layout. Geotechnical work must account for wooded-site constraints, with no tree removal, and recommend measures for erosion, sedimentation, stormwater, and groundwater management. - Optional services: Climate-change risk analysis and three schematic floor-plan and exterior-elevation alternatives for selected building types, if funded and requested. - Schedule: The contract is to run from award through the end of the stated fiscal period; exact duration depends on award timing. Geotechnical fieldwork is scheduled for November. No option years or subscription term are stated.

Description

Parks Canada Agency requires an engineering or architecture consultant to analyze options for constructing a new asset compound at Pacific Rim National Park Reserve, near its existing administration buildings. The work includes comparing building types, a life cycle cost analysis for the primary building, schematic site plans, and a preliminary geotechnical investigation. Depending on funding, optional services may include a climate change risk analysis and preliminary drawings. The estimated contract period is four months, with a proposed start date of November 16, 2026.

View original listing