Opportunity
SAM #1232SA27Q0004
USDA ARS Micro Gin Motor Control Center and Controls Upgrade
Buyer
ARS APD
Posted
October 07, 2026
Respond By
October 14, 2026
Identifier
1232SA27Q0004
NAICS
541330, 335314, 238210
USDA ARS is seeking a complete controls upgrade for the Micro Gin at its Cotton Ginning Research Unit in Stoneville, Mississippi. - Government buyer: U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS); the documents identify the Cotton Ginning Research Unit, USDA ARS AFM APD, and Research, Education, and Economics. - Procurement: Supply and install a motor control center (MCC), programmable logic controller (PLC), human-machine interface (HMI), and related electrical equipment to replace existing hardwired controls. USDA provides the motors. - OEMs named: ABB Electrification U.S.; Schneider Electric; Eaton; Siemens; Rockwell Automation (Allen-Bradley); Mitsubishi Electric; Fuji Electric; General Electric; and Omron. Named examples include Schneider M340, Allen-Bradley CompactLogix 5380, Siemens SIMATIC S7-1500, Omron NX1P2, Eaton C440 overload relays, Schneider Altivar ATV340, Eaton Power XL DX1, and Mitsubishi FR-A800. Some substitutions require client pre-approval. - Main equipment: One MCC designed for 400 connected horsepower, with at least 600 A bus capacity, for a 480 V, 60 Hz, three-phase corner-grounded delta system; one PLC; HMI capacity to display 50 motor stations; one stand-alone motor-control console; and VFDs for motors designated in the motor schedule. The MCC includes space for four future compartments. - Controls and electrical scope: PLC I/O requirements are 80 discrete inputs, 86 discrete outputs, 26 analog inputs, and 20 analog outputs, with 20–25% spare I/O. Provide 120/240 V single-phase distribution, a 600 A main, wiring, conduit, cable trays, connections, programming, and integration. The SOW describes using the existing 45 kVA transformer for distribution as required; an alternate MCC service arrangement is also described. - Notable requirements: The HMI must support process displays, alarms, trends, motor controls, and production records, and show 50 motor start/stop stations on one or two screens. The console must be NEMA 4 steel and include an emergency stop, key-lock On/Off switch, and Manual Re-Set button. Equipment must be suitable for the facility’s dusty, humid, temperature-variable, and electrically noisy environment. - Services: Remove existing controls and wiring; install and integrate equipment; perform factory and field testing, commissioning, and adjustments; and provide two workdays of training for up to five owner representatives. Factory testing must follow applicable ANSI, NEMA, and UL standards. - Schedule information: PLC and HMI delivery is required within 120 days after contract acceptance, and the SOW sets a completion deadline. The sources-sought notice is market research, not a solicitation or request for proposal.
Description
Sources sought notice in accordance with the attached memorandum and supporting documents.