Opportunity

City of Sebastian MyVendorLink #2026-214

FMPA seeks GSU transformer bushing replacement for CT2 and CT3

Posted

September 09, 2026

Respond By

October 08, 2026

Identifier

2026-214

NAICS

238210, 221121

FMPA is seeking proposals to replace generator step-up transformer bushings on two units at Stock Island Generating Station. - Buyer and location - Florida Municipal Power Agency (FMPA), serving Stock Island Generating Station in Monroe County, Florida. - Requested work - Replace the generator step-up (GSU) transformer bushings on CT2 and CT3; the request identifies two transformer units, but does not state the number of individual bushings or provide detailed bushing specifications or part numbers. - Address transformer oil handling: partial draining for CT3 and full draining and storage for CT2. An alternate discusses vacuum oil processing and moisture reduction. - The materials also raise existing gasket and leak conditions and whether additional components or instruments should be replaced. - Requirements and scope considerations - Historical transformer outline drawings and electrical schematics are unavailable. - Insurance is required. No bid, performance, or construction bonds are required. - No OEM or manufacturer is identified, and no detailed parts list is provided. - Named vendors and participants - Aubrey Silvey; RESA Power; Aecon Utilities (US) Ltd.; ARISMA GROUP LLC; Blackridge Research & Consulting; Cantrell Consulting Co.; Dara Harsh; DF Interactive LLC; Electric Power Systems International Inc.; Electrical Engineering Enterprises, Inc.; NexGen Utility Sales; Power Substation Services; RESA Service, LLC; RMS Energy Co., LLC; Steadfast Line Holdings LLC; and Technology International, Inc. - These names are identified as supplemental vendors or planholders, not as awardees or confirmed manufacturers.

Description

Florida Municipal Power Agency (FMPA) invites proposals for CT2 and CT3 GSU transformer bushing replacement at Stock Island Generating Station. Required vendor uploads are a quote, qualifications, and proposal. Online submissions are accepted, insurance is required, and no bid, performance, or construction bonds are required. Proposals are due October 8, 2026, at 10:00 AM EST.

View original listing