Opportunity
Brazos Valley Ionwave #27-001
Bryan wastewater sewer, bank stabilization, and pump replacement construction
Posted
October 06, 2026
Respond By
November 03, 2026
Identifier
27-001
NAICS
237110, 237990
The City of Bryan is seeking proposals for three wastewater infrastructure construction packages in Bryan, Texas. - Government buyer: City of Bryan, Texas — Purchasing Department; Brazos County. - Package A — NW Sewer Interceptor: Remove existing sewer infrastructure and install new sewer lines, 48-inch concrete piers, and manholes; connect to an existing 20-inch sewer using a FURNCO connection; restore and stabilize disturbed areas. - Package B — Still Creek Sewer Plant Bank Stabilization: Install effluent and storm sewer piping, two 12-inch swing check valves, a 6-foot doghouse manhole, sheet piling, and grouted rock-rubble bank protection. Temporary bypass pumping is required during manhole work. - Package C — Still Creek WWTP Pump Replacement: Replace three pumps—two 6-by-6-inch units and one 10-by-8-inch unit—with motors, piping, valves, fittings, gauges, electrical connections, and controls. Remove and deliver the existing pump assemblies and two slide gates to the City; bypass pumping is required on 30-, 42-, and 15-inch mains. - Named products and references: Flex-Terra HP-FME hydro-mulch seed treatment and Excel 995-10 western excelsior slope protection; a FURNCO connection is specified. No pump or motor manufacturer/OEM or equipment part numbers are identified. - Notable requirements: Trench safety planning for excavations deeper than 5 feet; stormwater pollution prevention measures; site cleanup, topsoil, grading, seeding, and restoration. Package C motors are specified at 25 HP, 25 HP, and 60 HP for Pumps #4, #6, and #8, respectively.
Description
The City of Bryan is requesting proposals for three projects: the NW Sewer Interceptor (A), Still Creek Sewer Plant Bank Stabilization (B), and Still Creek WWTP Pump Replacement (C). The work includes sewer construction and replacement, bank stabilization and related earthwork, and removal and replacement of wastewater pumps, motors, piping, valves, and associated components. The bid documents include separate schedules for projects A, B, and C, with detailed technical specifications and drawings. A mandatory pre-proposal meeting and site visit is scheduled for October 13, 2026, at 10:00 AM CT.