Opportunity

New Brunswick Opportunities Network #UM2619-MJB26A

General contracting for Université de Moncton laboratory and classroom renovations

Posted

October 07, 2026

Respond By

October 28, 2026

Identifier

UM2619-MJB26A

NAICS

236220, 238220, 238210, 238290

Université de Moncton is seeking a general contractor to renovate FSSSC and BASCI laboratory and classroom spaces in the Pavillon Jacqueline-Bouchard. - Government buyer: Université de Moncton, Service de planification des installations physiques; work is at the Jacqueline-Bouchard Pavilion on the Moncton campus. - Project scope: Renovations on two levels, including demolition, flooring, partitions, doors and frames, cabinetry, ceilings, painting, acoustic improvements, sinks, and related plumbing, electrical, HVAC, ventilation, heating controls, and fire-protection work. - Notable equipment and manufacturers: Daikin WSCH heat pumps; Systemair Avex 700 energy-recovery ventilators; Neptronic duct heater; EH Price louvers; and Lithonia lighting fixtures. Other named manufacturers or product references include ClimateMaster, Belimo, Fantech, Lifebreath, Greentek, CREE, Cooper, Signify, Bryant, SensorSwitch, Duro-Dyne, TAMCO, and Eaton/Cutler-Hammer. Cree, Cooper, and Signify are listed as lighting alternatives. - Quantified equipment: Six heat pumps are scheduled in the mechanical drawings: two Daikin WSCH019 units and four Daikin WSCH009 units. Two Systemair Avex 700 energy-recovery ventilators, one Neptronic DF C100H duct heater, one transfer grille, two EH Price DE635 louvers, and two TAMCO 9000 motorized dampers are also identified. Electrical drawings separately list equipment tags and electrical characteristics; see line items below for all listed references. - Other specified work: Modify sprinkler piping and install quick-response sprinkler heads; make plumbing alterations and install a stainless-steel lavatory; modify heating controls and ventilation systems; and complete electrical changes, including lighting, receptacles, circuits, and panel connections. Existing AV-related equipment identified for removal is to be returned to the owner where noted. - Important requirements: Coordinate work with existing building systems and other trades, follow the project drawings and specifications, and comply with asbestos-handling and hot-work safety requirements. The site visit is non-mandatory. Construction is to be completed before the end of March 2027. - Quantities and pricing: Several construction materials and sprinkler heads have no stated quantities. No contract value or standalone purchase quantities for the overall renovation are provided.

Description

Université de Moncton is seeking a general contractor to renovate certain laboratories and classrooms for FSSSC and BASCI at Pavillon Jacqueline-Bouchard on its Moncton campus. Work is to be carried out according to the attached drawings and specifications. Amendment 1 modifies section 4, “Site Visit.” A general, non-mandatory site visit is scheduled for October 13, 2026, at 10:00 a.m., at the pavilion’s main entrance.

View original listing