Opportunity
New York State Contract Reporter #2138797
St. Paul’s landmark roof replacement and preservation work
Posted
September 04, 2026
Respond By
October 15, 2026
Identifier
2138797
NAICS
238160, 238140, 238120, 238910, 562910, 236220, 238150, 238190
The Incorporated Village of Garden City is seeking bids for historic roof and building-preservation work at St. Paul’s in Garden City, New York. - Government buyer: Incorporated Village of Garden City; Purchasing Division, with Engineering Department and Department of Public Works involvement. - Project scope: Abatement and removal of hazardous materials where present, roof demolition and replacement, roof-framing repairs, and preservation work on the landmark building. - Roofing products and named OEMs: - DaVinci Roofscapes Inspire Slate synthetic slate for the mansard roofs and as a clock-tower option. - EcoStar 50-year synthetic slate as an alternate roofing system. - CertainTeed Grand Manor UL 2218 Class 4 impact-resistant asphalt shingles as an alternate for the mansard roofs and clock tower. - Garland Co. StressPly Plus FR Mineral cold-applied two-ply system for approximately 25,000 square feet of flat roofs, including four areas of approximately 12,800, 4,600, 3,700, and 3,900 square feet. A 30-year no-dollar-limit warranty is specified in the drawings. - GAF silicone roof-coating system or approved equal. - Other products and work: Genuine slate matching the existing clock-tower roof (estimated at 25% of its surface); black aluminum roof ladders; three layers of reinforced tarps over skylights; and one-inch bluestone chimney caps. - Preservation and construction requirements: Retain serviceable historic copper gutters, leaders, and flashings; repair rather than replace components where practical; provide chimney-securement engineering calculations and shop-drawing details; and install surface-mounted counterflashings only. - Masonry work: Up to 10,000 square feet, divided into 2,000 square feet each of stone replacement, brick replacement, brick repointing, stone repointing, and resetting existing stonework. Work quantities are determined in the field. - Other services: Temporary facilities and building protection, asbestos and lead abatement as applicable, structural support and engineering, roof-framing and sheathing repairs, and site safety and cleanup. - Period of performance: One year; the notice does not state specific start or end dates. - Estimated value: Approximately $1.5 million–$4 million; this is an analytical estimate, not a stated government amount.
Description
The Village of Garden City seeks sealed bids for landmark preservation work at 295 Stewart Avenue. The scope includes replacement of the mansard roofing system, excluding the clock tower, along with general requirements and related preservation and construction work described in the bid specifications and drawings. Masonry repairs may include stone and brick replacement, repointing, and resetting, with Addendum No. 2 specifying a breakdown totaling 10,000 square feet if required. Bid submissions must include signed copies of Addenda Nos. 1 and 2 and are due October 15, 2026, at 11:00 AM EDT.