Nevada Ionwave #917-GS Addendum 1
UNLV CMAR services for the December 6 Memorial Healing Garden
Posted
September 24, 2026
Respond By
October 15, 2026
Identifier
917-GS Addendum 1
NAICS
236220
UNLV is seeking a Construction Manager at Risk (CMAR) to deliver a permanent campus memorial garden through preconstruction and construction services. - Government buyer: Board of Regents of the Nevada System of Higher Education (NSHE), on behalf of the University of Nevada, Las Vegas (UNLV). Offices referenced include UNLV Purchasing and Contracts, Planning & Construction and Real Estate, and NSHE Business Center South. Grace Scheidt is identified as a purchasing analyst. - Project and estimated value: December 6 Memorial Healing Garden, a campus memorial and landscaped site improvement project with an estimated cost of approximately $2.2 million. - Requested services: One CMAR engagement covering preconstruction and construction. Preconstruction includes design and constructability reviews, estimating, scheduling, value analysis, site logistics and phasing, long-lead item checks, procurement planning, risk review, and development of a Guaranteed Maximum Price (GMP). Construction includes project management, subcontractor coordination, procurement, site work, quality and safety management, testing and inspections, punch-list work, and closeout. - Conceptual project elements: Four memorial zones arranged around a central elm tree, a meandering pedestrian path, seating, landscaping and specimen trees, memorial markers and signage, lighting, and related site improvements. Concept materials include concrete, decomposed granite, local rock, stainless steel, wood, and copper-colored steel. No product part numbers or quantities are specified. - Named design collaborators: Gensler Las Vegas and the LAGE design team are referenced in conceptual-design materials; they are not identified as proposers or awarded vendors. No product OEMs are identified. - Notable requirements: The CMAR must develop a GMP and coordinate cost and schedule through design. Nevada public-works qualification for the applicable project cost category, prevailing-wage and apprenticeship requirements, insurance and bonding, safety planning, and warranty obligations apply. The proposal and GMP should account for applicable premium costs if weekend or legal-holiday work is planned; commissioning, if required, is expected to be limited. - Schedule: Preconstruction is planned before construction, with completion targeted ahead of a remembrance event. The documents contain an apparent inconsistency in the anticipated construction start relative to the preconstruction schedule; the CMAR will need to coordinate the final schedule with UNLV. - Contract value context: The stated approximate project cost is $2.2 million; the final GMP is to be developed through the CMAR process.
Description
UNLV is soliciting proposals from qualified Construction Managers at Risk to provide preconstruction and construction services for the December 6 Memorial Healing Garden on the UNLV campus. The project will create a permanent memorial garden honoring three UNLV colleagues who died and the critically injured survivor of the December 6, 2023 campus shooting. The solicitation states an estimated project cost of approximately $2,200,000. Public works proposers must be qualified with Nevada’s State Public Works Division for the required cost category; no pre-proposal meeting or site inspection is scheduled.