Opportunity

Georgia Procurement Registry #PE-66062-NONST-2027-000000495

Progressive design-build improvements to Atlanta’s Peachtree Raw Water Pump Station

Posted

October 06, 2026

Respond By

October 30, 2026

Identifier

PE-66062-NONST-2027-000000495

NAICS

237110, 237990

The City of Atlanta is seeking a progressive design-build team to rehabilitate and improve the Peachtree Raw Water Pump Station. - Buyer - City of Atlanta, Department of Watershed Management (DWM); no specific office beyond DWM is identified. - Scope - Provide design, preconstruction, and construction services for the pump station and related raw-water infrastructure. - Rehabilitate or replace Pumps 1 and 2, associated valves and piping, and improve Pump Buildings 1 and 2 and electrical distribution. - Assess raw-water main alternatives, including reuse of an existing 42-inch main or construction of a new 60-inch main, and develop a dedicated main serving Pumps 1 and 2. - Products and quantities - Two pumps (Pumps 1 and 2); no manufacturer or part numbers are specified. - Electrical distribution equipment and raw-water main, valves, and piping; quantities and part numbers are not specified. - Named OEM/vendor - Autodesk is named for the required software: Revit for applicable BIM modeling, AutoCAD for diagram sheets, and Civil 3D for civil work. No pump or other equipment manufacturers are identified. - Notable project requirements - Complete topographic and subsurface utility surveys, geotechnical investigations, laser scanning and BIM modeling, and a structural assessment by a licensed structural engineer. - Evaluate three pumping and discharge-main configurations; perform constructability and cost evaluations and support development of a Guaranteed Maximum Price before construction. - Keep the operating station in service and maintain pumping capacity during construction. Plan coordinated outages, temporary bypass or line tapping, power transfers, and continuity of the existing seal support system.

Description

The City of Atlanta, on behalf of its Department of Watershed Management, plans a multi-step sealed bid process, beginning with prequalification and followed by an Invitation for Bid, to select a qualified Progressive Design-Builder. The contractor will provide design, preconstruction, and construction services for improvements to the Peachtree Raw Water Pump Station, including pump rehabilitation and replacement, work on Pump Buildings 1 and 2, electrical distribution improvements, and evaluation and development of raw water main alternatives. Interested firms must demonstrate relevant project experience, technical and construction capabilities, staffing, management, and resources, including the ability to coordinate design and construction and support development of a Guaranteed Maximum Price. A pre-solicitation conference will be announced to provide further details and address questions.

View original listing