Opportunity

City of Sacramento PlanetBids #B27151111005

Construction of Last Mile Fiber-Optic Infrastructure at 11 Sacramento Locations

Posted

October 05, 2026

Respond By

October 28, 2026

Identifier

B27151111005

NAICS

237130, 238210

The City of Sacramento is seeking a contractor to build fiber-optic infrastructure at 11 locations as part of its Last Mile Project, Construction Package 4. - Government buyer: City of Sacramento, Department of Public Works, Engineering Services Division. - Opportunity: Sacramento Last Mile Project, Construction Package 4; solicitation B27151111005; City Project No. A07001804. - Scope: Furnish and install a fiber-optic trunk-line system and supporting infrastructure at 11 locations: 28th Street/Sutters Landing Park, 43rd Avenue/I-5, Freeport Water Tower, Bruceville Road, Freeport Boulevard (Blair to Florin), Fruitridge Road, 24th Street, 66th Street, Greenhaven Drive, Del Paso Fire Station 20, and Folsom Boulevard. - Products and quantities: Conduit, handholes/pull boxes, splice vaults, detectable pull tape, tracer tape, and fiber-optic cable. Specific quantities and part numbers are not provided; plans generally call for two 2-inch conduits, with some single-conduit sections. - Conduit and vault specifications: Conduit may be 2-inch Schedule 40 PVC or HDPE, including HDPE SDR 13.5. The specified N48/N40 splice vault is a 20K-rated polymer-concrete vault, 30 inches wide by 48 inches long by 36 inches deep, or approved equal; covers are 10K-rated polymer concrete. Handholes in traffic areas must be H-20 traffic-rated. Detectable pull tape must have at least 1,200 lbf tensile strength and sequential footage markings. - Construction and site services: Installation may use directional boring, trenching, or microtrenching; plowing and aerial installation are prohibited. Work includes potholing, utility locating and protection, survey and staking, traffic and pedestrian safety measures, site restoration, and as-built documentation. - Notable requirements: Restore affected roads and surrounding areas to existing condition or better; protect utilities, trees, and public access; follow applicable City, Caltrans, and California traffic-control standards; obtain a safety permit for trench excavations five feet or deeper. California Class A and applicable C7/C10 contractor licensing, and local-hire/CWTA requirements when applicable, are identified in the bid materials. - Schedule and estimate: Complete construction within 60 working days from the Notice to Proceed. The engineer’s estimate is $2,200,000. Bid materials specify liquidated damages of $4,200 per calendar day of delay. - OEMs and vendors: No manufacturers, OEMs, or commercial vendors are named in the provided materials.

Description

The City of Sacramento is seeking bids for construction of the Sacramento Last Mile infrastructure, Package 4. Work includes furnishing and installing the equipment and materials shown in the plans and special provisions across 11 locations, with 24 plan sheets. The project has an estimated construction value of $2,200,000 and a construction time of 60 working days. Bids must be submitted on printed forms to the 1st Floor drop box at New City Hall by October 28, 2026, at 2:00 p.m.; the project is federally funded.

View original listing