Opportunity

Tennessee Department of General Services #32701-14030

Henry Horton State Park Camp Store renovation, including construction, electrical replacement, and HVAC

Posted

October 06, 2026

Respond By

October 21, 2026

Identifier

32701-14030

NAICS

236220, 238210, 238220

Tennessee is seeking a qualified contractor to renovate the Henry Horton State Park Camp Store and supply the specified building materials, systems, and equipment. - Government buyer: State of Tennessee, primarily the Department of Environment and Conservation; Facilities Management is identified in the scope documents. The Department of General Services is also named in the initial notice. The bid contact is Cynthia A. O’Brien. - Scope: One coordinated renovation covering demolition, expanded retail and storage areas, exterior and interior construction, restroom updates, a complete electrical replacement, lighting, and HVAC. The contractor provides labor, materials, equipment, cleanup, permits, and final inspection. - Named OEMs and product brands include Mitsubishi Electric (GX Series mini-split), Happy Feet (Dynamic Fit HF1503 flooring and HF9100 adhesive), ChargePoint (CPF50 charging circuit), Square D/Schneider Electric (QO200TRCP electrical panel and disconnects), Janus (Series 300 Model 324 roll-up doors), Trulite (storefront door and windows), and LP SmartSide siding and trim. Other specified brands include Huber ZIP System, Woodford, Best Access, ToughRock, Sequentia, American Standard, Sloan, allen + roth, Delta, Reliabilt, Kwikset, PLT, Bulbrite, Halco, Lithonia Lighting, Broan-NuTone, BRK Electronics, and American Retail Supply. - Key specified quantities and part numbers include 1,200 sq. ft. of Happy Feet Dynamic Fit LVP, part HF1503; 192 sq. ft. of American Retail Supply MDF slat wall, SKU 65010; one Mitsubishi GX Series dual-head mini-split; one Square-D QO200TRCP 200-amp panel; one ChargePoint CPF50 EV-charging circuit; two Janus Model 324 roll-up doors; four Trulite storefront windows; and two Woodford Model 17 wall hydrants. - Other notable requirements include a 20-SEER2 heat-pump system using R-454B refrigerant, new code-compliant electrical circuits and devices, a dedicated 240-volt EV-charging circuit, specified restroom fixtures, and approved materials or substitutions. Applicable Tennessee contractor licensing and building-code requirements apply. - The procurement is a one-time construction project. The documents describe separate materials and labor bid lines and an award for the complete renovation to the lowest-cost responsive bidder.

Description

The solicitation seeks a contractor to provide all materials, equipment, supplies, and labor needed to renovate the Camp Store at Henry Horton State Park. Work includes renovating the building interior, extending retail space, replacing the electrical system, installing a Mini-Split HVAC system, and building storage space. On-site work is to be completed by March 3, 2027, with camp store work scheduled between December 14, 2026, and March 3, 2027. Bidders and applicable subcontractors must hold the specified active Tennessee contractor licenses; a single contract will be awarded to the lowest-cost responsive bidder.

View original listing