Opportunity
El Paso Water Ionwave #CSP29-26 Addendum 1
Construction of the Rene Drive 30-inch sanitary sewer interceptor extension
Posted
September 13, 2026
Respond By
October 07, 2026
Identifier
CSP29-26 Addendum 1
NAICS
237110, 237990
El Paso Water Utilities Public Service Board is soliciting construction proposals for a major sanitary sewer interceptor extension in El Paso, Texas. - Government buyer: El Paso Water Utilities Public Service Board (EPWater), El Paso Water Utilities, Purchasing & Contracts Administration. - Scope and quantities: Approximately 6,877 linear feet of 30-inch SDR-26 PVC sewer main; 23 72-inch concrete manholes; 343 vertical feet of cured-in-place manhole liner; and associated roadway, pavement, driveway, and site restoration. A 586-foot 8-inch SDR-35 PVC sewer main appears in the bid items, but the addendum clarifies that the future 8-inch sewer is outside this contract. - Other specified work: Remove one existing 48-inch manhole and about 60 feet of 12-inch PVC sewer line; replace one sewer service with an approximately 50-foot 4-inch line; provide trench safety, connect to an active manhole, install a temporary septic holding tank, and provide site video before and after construction. - Restoration quantities: 108 linear feet of roundabout curb and gutter; 470 square feet of sidewalk; 305 square feet of concrete driveway; 14,021 square yards of unpaved road restoration; 3,954 square yards of subgrade work and 6-inch crushed-stone basecourse; and 3,149 square yards of 3-inch Type C HMAC. - Notable requirements: Basecourse installation and subgrade restoration beneath paved areas are separate bid items. Maintain at least 3 feet of clearance beneath the Magellan gas line; casing is not required. Subcontractors performing cured-in-place manhole liner work must meet the specified qualifications. Verify that the existing 12-inch sewer stub is actively carrying wastewater before removing the existing manhole and sewer main. Landscaping, signs, irrigation, and roundabout pavement markings are also included as applicable. - OEMs and vendors: No product OEMs or named product vendors are identified. Magellan is named in connection with the gas line; it is not identified as a product supplier. - Value and duration: Estimated construction value is $4,840,493.40–$5,512,784.15. Estimated duration is 300 calendar days, with substantial completion at 270 days and final completion at 300 days after the Notice to Proceed.
Description
EP Water is soliciting competitive sealed proposals for the Rene Dr. 30-inch sanitary sewer interceptor extension. The procurement includes project plans, technical specifications, and a geotechnical report, with Addendum 1 revising measurement-and-payment pages and providing responses to bidder questions. Proposals are due October 7, 2026, at 1:30 PM MT, and the original bid bond is due before the bid opening. The engineer’s estimated value is $4,840,493.40 to $5,512,784.15.