Opportunity
Saskatchewan Tenders #4500100226
Dube Centre Courtyard Balcony Safety Upgrade Construction
Posted
October 05, 2026
Respond By
October 23, 2026
Identifier
4500100226
NAICS
236220, 238190
The Saskatchewan Health Authority is seeking construction bids for balcony safety upgrades at the Dube Centre Courtyard at Royal University Hospital in Saskatoon. - Government buyer and project team - Buyer: Saskatchewan Health Authority, Provincial Procurement Contracts; Royal University Hospital is the project location. - Adero Architecture is the project consultant. Brownlee Beaton Kreke (Saskatoon) Ltd. is identified as the structural engineering firm. - No product OEMs or manufacturers are named. - Requested work and components - Remove existing balcony glazing, guardrail components, steel posts or columns, and benches; repair the concrete deck and remove soffit as needed for new bracing. - Supply and install a new structural glass guard rail with custom steel posts or columns, aluminum curtain-wall framing and glazing, custom glass backer plates, and structural braces. - Apply patterned or obscure graphic film to the exterior face of the glass; coordinate the pattern with the consultant. - Restore the lawn and protect nearby shrubs, trees, and vegetation. - Notable project requirements - Construction will occur at an occupied mental-health facility and requires healthcare-appropriate infection-control measures. - Coordinate component dimensions, connections, and finishes with the architect and relevant suppliers. Exterior steel is specified for protective finishing; a brace is specified as HSS 76x76x4.8 galvanized steel. - Structural-steel shop drawings must be engineer-sealed. No product quantities or part numbers are provided. - Performance period - The contractor is to propose the construction schedule and start and completion timing. No duration, option periods, or annual subscription are stated.
Description
The Saskatchewan Health Authority is inviting bids from qualified contractors for the Dube Centre courtyard Phase 2 second-floor outdoor balcony safety upgrades. Work includes removing the existing structural glass guard rail and installing a new structural glass guard rail with custom steel posts, glazing, and associated aluminum framing. The scope also includes related access and scaffolding work in an occupied mental-health facility, with details specified in Adero Architecture’s IFT drawings and specifications. Bids are due October 23, 2026, at 2:00 p.m. Saskatchewan time.