Opportunity
Clark Public Utilities Procureware #B731
Underground cable replacement, boring, conduit, and electrical equipment installation for Clark Public Utilities
Posted
October 02, 2026
Respond By
October 20, 2026
Identifier
B731
NAICS
237130, 238210
Clark Public Utilities is seeking a qualified contractor to replace underground electrical cable and install related equipment in Battle Ground, Washington. - Government buyer: Clark Public Utilities; project area is SW 2nd Avenue and SW 12th Street in Battle Ground, within City of Battle Ground rights-of-way and public utility easements. - Scope: Bore approximately 6,700 feet; install 2-inch and 4-inch conduit; and install and energize approximately 7,000 feet of jacketed 1/0 aluminum primary cable. Work also includes transformer and junction-box installation or relocation, electrical connections, and disconnecting and abandoning existing direct-buried conductors. - Materials and quantities: The schedule lists 6,550 feet of 1/0 aluminum 15-kV EPR-jacketed cable (part 2390), three 50-kVA padmount transformers (part 1318), one three-phase fiberglass junction box (part 2047), and additional cable, vault, grounding, connector, elbow, fault-indicator, and installation materials detailed below. The cable table also lists 12 cable/conduit span entries with quantities and lengths. - OEMs and vendors: No cable, transformer, or equipment manufacturer is identified. Clark Public Utilities and the City of Battle Ground are named public entities; Sweetbriar and Wesleyan appear as cable schedule descriptors, not confirmed manufacturers. Some materials are identified as utility stock or free-issue. - Notable requirements: Bids are limited to contractors prequalified by Clark Public Utilities for electrical-facility construction. Conduit must be installed by boring; open trenching requires advance approval from the utility superintendent. The contractor must obtain the City of Battle Ground right-of-way permit.
Description
Clark Public Utilities seeks bids for underground cable replacement at SW 2nd Ave and SW 12th St. The work includes boring approximately 6,700 feet in City of Battle Ground right-of-way and public utility easements, installing multiple runs of 2-inch and 4-inch conduit, and providing the associated conduit and installation materials. The contractor will install and energize approximately 7,000 feet of jacketed 1/0 AL primary conductor, three single-phase padmount transformers, and a three-phase vaulted J-box, along with associated work described in the Summary of Work. Open trenching requires prior approval from the CPU Superintendent, and only contractors prequalified by Clark Public Utilities may bid.