Opportunity
British Columbia BCBid #RFP 20629
BC Hydro Fort Nelson Generating Station gas-fired heaters and burner building
Posted
October 02, 2026
Respond By
October 27, 2026
Identifier
RFP 20629
NAICS
238220, 238210, 238290, 236220
British Columbia Hydro and Power Authority (BC Hydro) is seeking installation of gas-fired heating equipment and associated systems at Fort Nelson Generating Station. - Government buyer: British Columbia Hydro and Power Authority (BC Hydro); the opportunity identifies Fort Nelson Generating Station as the project site. No sub-agency or contracting office is specified. - Requested equipment and work: - A prefabricated natural gas-fired glycol combustion air heater and a natural gas-fired fuel gas heater. - A prefabricated burner building for the heaters. - Auxiliary equipment, piping, valves, and foundations. - Installation and integration of electrical, protection and control, and fire alarm systems. - OEMs and vendors: No manufacturers, OEMs, or vendors are named in the available notice. - Notable requirements: The work combines equipment supply with installation and site integration. The notice does not state quantities, part numbers, equipment models, or detailed performance specifications; these are not available in the provided material. - Schedule: Completion is targeted for 2027. A start date, duration, and option periods are not specified.
Description
The RFP seeks installation of a prefabricated natural gas-fired glycol combustion air heater and a natural gas-fired fuel gas heater at BC Hydro Fort Nelson Generating Station. The work includes installing a prefabricated burner building for both heaters, as well as supplying and installing auxiliary equipment, piping, valves, and foundations. Electrical, protection and control, and fire alarm system integration work are also included. Refer to the RFP documents for full details.