Opportunity

California eProcure #26-336714

Patton Landing site accessibility, restroom, and infrastructure improvements

Posted

October 02, 2026

Respond By

November 10, 2026

Identifier

26-336714

NAICS

236220, 237990

California’s Department of General Services is seeking a lump-sum construction bid for accessibility and site improvements at Patton Landing. - Government buyer: State of California, Department of General Services (DGS), Real Estate Services Division, Project Management and Development Branch, for the California Tahoe Conservancy. - Project: Site Compliance and Improvements – Patton Landing, Project 13891, in Carnelian Bay, Placer County. The project cost estimate is $1,124,400. - Construction scope: Demolition and site work; accessible pedestrian routes and parking; new concrete walkways and stairs; replacement boardwalk decking and hydronic snow-melt system; and renovation of two restrooms, including plumbing, electrical, finishes, accessories, signage, and site furnishings. - Specified OEMs and products: - HAWS: Model 1119FRP dual-height drinking fountain with bottle filler and Model 6521FR in-wall valve. - Willoughby: ES-1015-HC-DMS-E1L1-PBH-1CC-TE-TMV lavatory and ETF-1490-FM accessible water closet. - Powers: Temperature mixing valve; model not stated. - Lochinvar: LTHR-199X3 gas-fired water heater (quantity 1) and WHB285 tankless boiler (quantity 1). - Hilti: Kwik Bolt TZ2, 3/8-inch concrete anchors; quantity not stated. - SpecSeal: Firestop products for applicable pipe penetrations; model and quantity not stated. - Koala Kare: KB300-00 surface-mounted diaper changing station. - Bobrick: B-5806x36 and B-5806x48 grab bars, B-290 1836 framed mirror with shelf, and B-3949 paper-towel dispenser/trash receptacle combination. - Lighting and site materials: Betacalco SF3 step light (8207610-TF-AG-RIH6503), bollard light (B24232-K3-BRZ), downlight (JSF-5IN-07LM-SWW5), exit sign (LV-2-AB-1-G-120/277-EL N - UM), and Nichols GCM-1-150 aluminum grating or equal. Precast concrete decking is also specified. - Notable requirements: The project is federally funded and includes Build America, Buy America provisions, 3% DVBE participation, phased construction, and applicable Tahoe Regional Planning Agency requirements. The overall completion period is 210 calendar days; the described phases are 90 and 120 days.

Description

The project procures labor, materials, and services for demolition, site work, and restroom alterations at Patton Landing. Work includes accessibility improvements to pedestrian circulation and parking, drinking fountains and other site furnishings, replacement of boardwalk decking, and related work. Sealed bids are requested, and attendance at the October 27, 2026 pre-bid site inspection is mandatory to submit a bid. Contractors must hold an A or B license and successful bidders must furnish payment and performance bonds, each for 100% of the contract price.

View original listing