US SLED #RFP - Vineyard City Parks & Recreation

Design-build parking, trail, utility, restroom, lighting, and landscape amenities for Vineyard City’s All-Wheels Concrete Skate Park

Posted

October 02, 2026

Respond By

October 27, 2026

Identifier

RFP - Vineyard City Parks & Recreation

NAICS

237310, 237990, 238910, 237110

Vineyard City Parks & Recreation is seeking a design-build team for site amenities around its planned All-Wheels Concrete Skate Park in Vineyard, Utah; the skate park itself is not part of this procurement. - Buyer and location: Vineyard City Parks & Recreation; project site at 125 S. Main Street, Vineyard, Utah. - Requested design and construction: Civil design and construction documents; utility extensions; an asphalt parking lot with at least 24 stalls, including two ADA-compliant stalls and curb and gutter; an approximately 375-foot-long, 8-foot-wide asphalt trail; and 6,000 square feet of landscaping with sod, water-wise trees and bushes, and drip irrigation. - Amenities: Purchase and install one two-stall restroom facility, one drinking fountain, two benches, three bike racks, and two street lights. - Geotechnical considerations: The attached Earthtec Engineering report recommends removing undocumented fill and topsoil, supporting foundations on uniform native soil or at least 18 inches of tested structural fill, and using Type II Portland cement for concrete contacting site soils because of moderate sulfate risk. It also advises seismic Site Class D design and construction observation, materials testing, and special inspections. The report notes mapped high liquefaction potential, though explored soils appeared non-liquefiable. - Named firms: Earthtec Engineering prepared the geotechnical report. Hunger Skateparks and American Ramp Company are identified in background materials as having developed conceptual skate-park and pump-track designs; Bowen & Collins is identified on a wetland-area drawing. These firms are not specified as required product manufacturers or as the selected design-build provider. - Requirements: Proposals are to include a project timeline, warranty information, relevant project references, and line-item pricing. Subcontractors require City pre-approval, and applicable licenses, permits, and performance and payment bonds are required.

Description

Vineyard City is soliciting proposals for a design-build contract for amenities surrounding its approximately 16,000-square-foot All-Wheels Concrete Skate Park. The scope includes civil design and construction documents, utility extensions, a restroom facility and drinking fountain, parking, an asphalt trail, lighting, landscaping, benches, and bike racks. The RFP states the project concerns the skate park amenities and identifies a line-item budget, technical proposal, and cost sheet as submission requirements. Proposals are due through Bonfire by October 27, 2026, at 5:00 PM.

View original listing