Opportunity
City of Santa Rosa PlanetBids #820812
Lucca Avenue drainage channel and inlet construction
Posted
October 01, 2026
Respond By
October 17, 2026
Identifier
820812
NAICS
237310, 237990
Santa Barbara County is seeking a contractor to improve drainage along Lucca Avenue with a new concrete channel and drain inlet. - Government buyer: County of Santa Barbara, Public Works Department, Transportation Division; project location is Lucca Avenue from Grand Avenue to the alleyway, in Supervisorial District 3. - Work requested: Drainage construction and associated traffic control, water-pollution control, roadway and structure excavation, culvert preparation, concrete work, and roadside sign resetting. - Bid-schedule quantities and item numbers: Traffic control system (120100), 1 LS; water pollution control program (130201), 1 LS; roadway excavation (190101), 37 CY; structure excavation (192002), 49 CY; Class 2 aggregate base (260203), 16 CY; cast-in-place structural concrete for drainage inlet (510094), 1 CY; 14-inch cast-iron grate (703234), 195 LF; culvert cleaning, inspection, and preparation (710360), 110 LF; minor concrete for miscellaneous construction (731502), 24 CY; minor concrete for driveway (731516), 5 CY; 1/4-inch stainless-steel diamond plate (750009), 112 LF; and roadside sign resetting on a metal post (820550), quantity 2. - OEMs and vendors: No product OEMs or material vendors are specified. PlanetBids is named as the bid-submission platform; Caltrans standards and plans are referenced. - Notable requirements: Construction materials are subject to the County’s Quality Assurance Program, including applicable sampling, testing, inspection, and certification requirements. Caltrans Standard Specifications and Standard Plans apply. The work also calls for traffic and fire-safety controls, water-pollution controls, and coordination to protect property access. - Estimated project value and schedule: Estimated value is $136,000. Complete the work within 15 working days; job-site activities are to start within 26 calendar days after award, subject to required water-pollution-control authorization.
Description
Santa Barbara County Public Works is soliciting bids for drainage improvements on Lucca Avenue, from Grand Avenue to the alleyway, in the 3rd Supervisorial District. The work includes constructing a new concrete channel and drain inlet, along with associated traffic control, excavation, concrete, and drainage-related work. The project must be completed within 15 working days, and the estimated project cost is $136,000. Caltrans Standard Specifications and Standard Plans apply; bids are due electronically by October 16, 2026.