Opportunity
City of Newport Beach PlanetBids #10169-1
Newport Beach concrete replacement and Hospital Road sidewalk improvements
Posted
October 01, 2026
Respond By
October 23, 2026
Identifier
10169-1
NAICS
237310, 238110, 238990, 237990
The City of Newport Beach Public Works Department is seeking a contractor for its FY 2026–27 Concrete Replacement Program and Hospital Road Sidewalk Improvements (Contract C-10169-1). - Buyer: City of Newport Beach, Public Works Department, Newport Beach, Orange County, California. - Scope: Demolish and replace sidewalks, curbs, gutters, driveways, access ramps, pavement, utility boxes, and related improvements; perform traffic control, surveying, tree work, landscaping, irrigation, striping, restoration, and as-built documentation. - OEM: Rain Bird products are specified for Hospital Road irrigation: XCZ-100-IVMQ drip control valve and XFS-CV-09-12 subsurface dripline. No other OEMs are identified. - Key quantities: 41,000 sq. ft. of street sidewalk and 6,000 sq. ft. of park sidewalk; 1,900 linear ft. of curb and gutter; 8,570 sq. ft. of driveway approaches; 35 access ramps; 85 utility boxes and covers; and 15 tree removals with stump grinding and parkway restoration. - Hospital Road landscape and related work includes 63 Natal Plum shrubs, 42 Green Carpet Natal Plum plants, 1,631 sq. ft. of wood mulch, 140 cubic yards of topsoil, new planting and irrigation improvements, and a 90-calendar-day plant establishment/maintenance period. - Notable requirements include maintaining existing irrigation service during construction, one-year irrigation and planting guarantees, and an ISA-certified arborist for the Concrete Replacement Program. - Estimated project value: $1,925,000. Contract duration: 90 consecutive working days.
Description
The City of Newport Beach is seeking bids for the Concrete Replacement Program FY 2026-27 and Hospital Road Sidewalk Improvements. Work includes removing and replacing concrete sidewalks, parkways, driveways, access ramps, curbs, gutters, and related roadway improvements, as well as pavement, utility, traffic control, landscaping, and irrigation work. The scope also includes tree work, restoration of damaged public and private improvements, temporary access during construction, and preparation of as-built plans. The estimated value is $1,925,000, and the stated duration is 90 consecutive working days; bids must be submitted electronically through PlanetBids.