Opportunity
San Juan Capistrano Planet bids #146659
Construction of Two Illuminated San Juan Capistrano City-Entry Monuments
Posted
October 01, 2026
Respond By
October 22, 2026
Identifier
146659
NAICS
237310, 238110, 238210, 238990, 561730
The City of San Juan Capistrano is seeking a contractor to build two illuminated city-entry monuments and complete related site work. - Government buyer: City of San Juan Capistrano, Department of Public Works and Community Services; Public Works, with the City Engineer as the City Representative. - Project: City Entry Monuments Project (CIP 24304), at Old Mission Road and Ortega Highway and on Camino Capistrano near the Costco parking lot. - Named OEMs/product brands: Belden — Rosewood Blend brick; Greenstone — Sendero decorative cobble. No manufacturer part numbers are specified. - Main construction and sign items: 262 linear feet of reinforced CMU wall; two reinforced concrete footings; 285 square feet of Belden brick; 330 square feet of Greenstone decorative cobble; two illuminated sign cabinets, two small illuminated city-seal cabinets, and two large illuminated city-seal cabinets. - Electrical and irrigation items: LED monument lighting controlled by time clocks; one weather-resistant GFCI receptacle; one irrigation smart controller and one replacement irrigation controller; replacement backflow, master valve, and flow sensor; one drip valve, one quick-coupler valve, and one ball valve; one backflow/point-of-connection equipment set; 244 square feet of drip irrigation; eight planter assemblies with irrigation laterals and flex-PVC drain lines. - Landscape items: Eight 3-gallon plants, 38 1-gallon plants, and 2.5 cubic yards of mulch. Work also includes soil preparation and fine grading for 244 square feet of planting area. - Other work: Mobilization, traffic control, night work, site fencing, construction staking, clearing and grubbing, sign-footing earthwork, removal of existing electrical and irrigation equipment, erosion control, site electrical installation, and 90-day landscape maintenance. - Notable requirements: Work at the northern monument site must take place at night, from 9 PM to 5 AM, Sunday through Thursday. The northern site also requires Caltrans traffic-plan review and an encroachment permit. Tree warranty coverage continues for one year after the plant-establishment period. - Estimated project value: $430,000.
Description
The City of San Juan Capistrano is seeking bids to construct two City Entry Monuments: one near Old Mission Road and Ortega Highway, and one on Camino Capistrano near the Costco parking lot. Work includes illuminated signage, electrical work, landscaping and irrigation improvements, and associated appurtenances shown in the contract documents. The stated estimated value is $430,000, and the project duration is 60 calendar days. Bid responses are electronic, with original bid security required to be delivered in person to the City Clerk’s Office before the bid-opening deadline.