Opportunity
Federal Register #P-15429-000
FERC Notice for Proposed 750-MW Fish Creek Pumped-Storage Project
Posted
October 02, 2026
Respond By
November 30, 2026
Identifier
P-15429-000
FERC is considering an application to study the proposed Fish Creek Pumped Storage Project in Nevada County, California; this is a hydroelectric permitting notice, not a purchase of goods or services. - Government buyer: Federal Energy Regulatory Commission (FERC), within the U.S. Department of Energy; no specific office is identified. - Applicant: RamaFlux Sierra PSH, LLC. No equipment OEMs or other vendors are identified. - Proposed project: One 750-MW closed-loop pumped-storage hydroelectric facility, identified as project P-15429-000, near Nevada City. - Includes new upper and lower reservoirs formed by embankments, steel-lined penstocks, a lined pressure shaft, and an underground powerhouse with reversible pump-turbine units. - Also includes a lower-reservoir intake structure, a new single-circuit 230-kV transmission line connecting to existing infrastructure, access routes, and associated facilities. - Notable requirements and limits: The requested preliminary permit would provide priority to file a license application during the permit term if issued. It would not authorize construction, land-disturbing work, or entry onto another party’s property without permission. - FERC is seeking public comments, motions to intervene, and competing applications or notices of intent to file competing applications.
Description
RamaFlux Sierra PSH, LLC filed an application for a preliminary permit to study the feasibility of the Fish Creek Pumped Storage Project near Nevada City, Nevada County, California. The proposed project is a 750-megawatt closed-loop pumped storage hydroelectric facility, including upper and lower reservoirs, water conduits, an underground powerhouse, a 230-kilovolt transmission line, access routes, and associated facilities. The permit, if issued, would give the holder priority to file a license application during the permit term; it would not authorize land-disturbing activities or entry onto others’ property without permission. Comments, motions to intervene, competing applications, or notices of intent were due by November 30, 2026.