Opportunity
Mississippi Procurement Portal #3170036707
Pike County roadway maintenance and improvements on Horace Holmes Drive and Jaguar Trail
Posted
October 01, 2026
Respond By
October 15, 2026
Identifier
3170036707
NAICS
237310
Pike County is seeking a contractor for roadway maintenance and improvements on Horace Holmes Drive and Jaguar Trail. - Buyer: Pike County Board of Supervisors, in coordination with the Mississippi Department of Transportation (MDOT), Office of State Aid Road Construction. The plans identify MDOT’s Roadway Design Division. - Project: State Aid Project SAP-57(17)M, covering approximately 0.370 miles at two sites in Pike County, Mississippi. - Scope: Roadway removals and excavation; aggregate base and asphalt paving; concrete curb, gutter, drainage pipe, and structures; traffic control, striping, signs, and raised markers; and erosion control, seeding, and vegetation work. - Major quantities: 620 tons of 9.5 mm asphalt; 1,080 cubic yards of Size 610 crushed stone; 2,300 cubic yards of unclassified excavation; 2,000 cubic yards of contractor-furnished borrow; 30 linear feet of 18-inch Class III reinforced concrete pipe; 4 linear feet of 36-inch Class III pipe; and 1,800 linear feet of temporary silt fence. - Notable requirements: Thermoplastic markings include 4-inch stripes with specified colors and thicknesses (60 or 90 mils), 120-mil white legends, and 90-mil detail striping. Drainage work includes pipe end sections; the plans also show concrete pipe collars. Erosion-control items include Type II silt fence and 20-inch wattles. Work references Mississippi’s 2024 Standard Specifications for State Aid Road and Bridge Construction. - OEMs and vendors: No commercial OEMs, manufacturers, or vendors are named; the specified items are construction materials and roadway work. - Performance period: Complete the project within 45 working days.
Description
Pike County, Mississippi is soliciting sealed bids for construction of approximately 0.370 miles of maintenance work, other than bridge work, on Horace Holmes Drive and Jaguar Trail under State Aid Project No. SAP-57(17)M. The work includes roadway improvements and related activities such as asphalt paving, drainage and curb work, pavement markings, traffic control, and erosion control. The contract period is 45 working days, and the award, if made, will go to the lowest qualified bidder based on published quantities. Bids are due October 15, 2026, at 11:00 a.m.; a certified check or bid bond for 5% of the total bid is required.