Opportunity
Rocky Mount Civicplus #320-150926TW
Turnkey Design and Construction of Sunset Park Playground
Posted
September 30, 2026
Respond By
October 28, 2026
Identifier
320-150926TW
NAICS
238990, 236220, 541330, 541320
The City of Rocky Mount is seeking a turnkey design-and-construction team for a new playground at Sunset Park in Rocky Mount, North Carolina. - Government buyer: City of Rocky Mount, Parks and Recreation / Purchasing Office. - Project scope: Deliver a complete, code-compliant playground, including design, engineering, procurement, shipping, site preparation, construction, installation, testing, inspections, permits, cleanup, restoration, and closeout documentation. - Required products and site work: - One 65-by-85-foot play area with a concrete border, subsurface, grading, and drainage. - Playground surfacing: pour-in-place or tile, with separate pricing for each option and an accessible connection to the existing sidewalk. - One rope-and-cable climbing structure for ages 6–12, at least 475 square feet, or an equivalent structure of equal or greater size and comparable quality and play value. - One swing set with at least three bays, two benches with pads, and one trash receptacle near the sidewalk. - Optional, separately priced alternates: Tot-lot equipment for ages 2–5, accessible play features, a playground shade structure, a bench shade structure, a picnic table and pad, additional benches, and other clearly identified enhancements. - OEMs and vendors: No manufacturers, brands, vendors, or product models are named; no part numbers are specified. Proposals may offer compliant products from qualified manufacturers. - Schedule and budget: Construction is planned for December through March and must be completed within 91 consecutive calendar days after the Notice to Proceed. The approximate project budget is $340,000. - Notable requirement: A mandatory pre-bid meeting and site visit is required.
Description
The City of Rocky Mount is seeking proposals for the design, procurement, and construction of a new playground at Sunset Park in Rocky Mount, North Carolina. The project includes a 65′ × 85′ play area with a concrete border, subsurface, grading, and drainage; accessible surfacing; a climbing play feature for ages 6–12; swings; benches; and a trash receptacle. The contractor must provide the design and engineering, site preparation, construction and installation, project management, testing, inspections, permits, cleanup, restoration, and closeout documentation needed for a complete project. Separately priced proposal alternates may include additional play equipment and amenities, shade structures, a picnic table, and other enhancements.