Opportunity
Kern High School District Planet bids #6946
Turnkey outdoor learning shade canopy and site work for Vista Continuation High School
Posted
September 30, 2026
Respond By
October 21, 2026
Identifier
6946
NAICS
238190, 236220
Kern High School District is seeking a turnkey outdoor learning shade canopy for Vista Continuation High School in Bakersfield. - Buyer: Kern High School District, with the solicitation materials identifying the Business Services Department and Facilities Planning Department. - Procurement: One base-bid package for a pre-engineered fabric shade canopy. The notice title references an alternate, but no alternate details are provided in the available materials. - Canopy scope: Furnish and install the fabric shade structure, including shade sail, structural members, factory finishes and touch-ups, and accessories. The design references DSA P.C. 04-123501. - Site work and coordination: Construct concrete foundations, including excavation, reinforcing steel, and backfill; remove spoils off-site; protect and coordinate around existing underground utilities; and coordinate with the electrical contractor on light-fixture installation. Required project documentation is included. Temporary fencing, toilets, and dumpsters are excluded. - OEMs and vendors: No canopy manufacturer, OEM, branded product, or supplier is identified in the available materials. - Notable requirements: The prime contractor must hold C-61 and D-34 licenses. Prequalification applies to the prime contractor and specified MEP subcontractors; applicable MEP classifications include C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46. The work is subject to prevailing-wage and public-works requirements. Liquidated damages are $2,000 per calendar day. - Schedule: The overall project is described as approximately 490 calendar days; the canopy work schedule is tied to the Construction Manager’s schedule.
Description
The project is for a turn-key, pre-engineered outdoor learning shade canopy at Vista Continuation High School. The work includes providing and installing the canopy, structural members, shade sail and accessories, as well as concrete foundations, excavation, reinforcing steel, backfill, and coordination with underground utilities and other trades. The listed contractor license requirements are C-61 and D-34, and the project duration is 490 calendar days. The estimated value is $70,305.39; bids are due October 21, 2026, at 2:00 PM, and prequalification requirements apply to specified prime contractors and MEP subcontractors.