Opportunity
New Brunswick Opportunities Network #MS 020-25
Founders Street Extension and Municipal Water, Sewer, and Road Construction
Posted
September 18, 2026
Respond By
October 02, 2026
Identifier
MS 020-25
NAICS
237110, 237990
Municipalité de Shippagan is seeking bids for a street extension and municipal water and sewer infrastructure project in New Brunswick. - Government buyer: Municipalité de Shippagan, New Brunswick; contact identified in the documents: Elise Roussel, Directrice générale et Greffière; municipal office at 200 avenue Hôtel-de-ville, Shippagan, NB. - Project: Prolongement de la rue des Fondateurs (Founders Street Extension), Project 020-25, under a unit-price construction contract. - Named company: Roy Consultants is identified as the project consultant. No product manufacturer or OEM is named in the documents. - Main work: Extend the road and install water distribution, sanitary sewer, and storm sewer networks and connections, including valves, hydrants, manholes, catch basins, and related site restoration and roadway work. - Key scheduled quantities: 340 m of 200 mm PVC DR18 water main; 251 m of 200 mm PVC DR35 sanitary sewer; 320 m of 300 mm HDPE storm sewer; 17 m of 150 mm water main; 77 m of 100 mm sanitary service; and 97 m of 25 mm water service. The schedule also includes valves, three hydrants, fittings, four sanitary manholes, storm inspection structures, catch basins, and road materials and work; see line items for the full list. - Notable requirements: Protect and locate existing utilities, document existing site conditions before construction, and reinstate disturbed areas. Water, sanitary, and storm materials must meet the stated standards, including ANSI/AWWA, CAN/CSA, ASTM, and applicable Canadian standards. The project also requires environmental protection, safety, quality control, and traffic regulation measures. - Addendum clarifications: Topsoil work includes placement, grading, and hydroseeding; sod is not required. Sleeves and pipe sections connecting to existing pipes at RIP#1 are included in the price for the 1050 mm storm inspection manhole, with no separate payment. PU#1 and PU#3 are 750 mm catch basins. - Performance and award: Work is planned across two construction seasons, with 30 working days of work after commencement and remaining work completed in the following season. Award is conditional on project funding.
Description
The Municipality of Shippagan is seeking bids for the extension of Founders Street in Shippagan, New Brunswick, under a unit-price contract. Work includes installing water distribution, sanitary sewer, and storm sewer mains and connections, plus related valves, fire hydrants, inspection structures, and associated road and site work. The project documents specify construction over two seasons, 2026 and 2027. Bids are due October 2, 2026, at 10:00 a.m. local time, and must include a bid bond of 10% of the total bid; award is conditional on project funding.