Opportunity
CanadaBuys #20173579
Engineering services for rehabilitation of bridges PO-01 and PO-02
Posted
September 30, 2026
Respond By
October 20, 2026
Identifier
20173579
NAICS
541330
The Ville de Sept-Îles is seeking engineering services to rehabilitate two bridges serving the access road to its drinking-water treatment plant. - Buyer: Ville de Sept-Îles; no specific department or office is identified. - Scope: Engineering for rehabilitation and structural reinforcement of bridges PO-01 and PO-02 over the Rivière des Rapides, including redesign of their approaches. - Review known deficiencies and conduct site visits, surveys, and investigations; determine which elements need reinforcement, repair, or replacement. - Develop designs, plans, specifications, and detailed cost estimates; support tendering and provide office and on-site construction supervision through closeout. - Address corrosion protection and painting, load-limit signage, bank stabilization, foundation and bearing access, and roadway, paving, and safety-barrier improvements. - OEMs and named organizations: No product OEMs are identified. The notice cites inspection and load-capacity reports by IGF Axiom and Groupe conseil CHG; their role is identified as report authors, not as suppliers for the requested services. - Key qualifications: Demonstrated structural engineering and bridge-work expertise, including steel and concrete bridge design, rehabilitation, strengthening, and assessment.
Description
La Ville de Sept-Îles is seeking professional engineering services for the rehabilitation and structural reinforcement of bridges PO-01 and PO-02 over the Rivière des Rapides, including redesign of their approaches. The work includes concept validation, site investigations, design documents and detailed cost estimates, technical assistance during tendering, and office and field construction supervision. Scope also includes corrosion protection, repairs or replacement of structural elements, bank stabilization, and approach roadway and safety-barrier work. The bridges are on the access road to the city's drinking-water treatment plant at 5000, rue Decoste, Sept-Îles, Québec; the estimated contract period is four months.