W071 ENDIST OMAHA is seeking repairs and upgrades to the Mather, California, fueling facility. - Government buyer: W071 ENDIST OMAHA, through the KO Contracting Office in Omaha. - Scope of work: Construction and repair work at the existing fueling facility, including: - Modify the existing 12,000-gallon F-24 aboveground storage tank by adding a sampling/gauging hatch, mechanical gauge, and full-length catwalk, and recoating the tank exterior. - Replace collision barriers and audible and visual alarms. - Repair and slope the remote containment basin drainage pipe; replace asphalt near the facility to improve stormwater drainage; replace refueler parking concrete; and replace asphalt near the truck offload area with concrete. - Replace the dispenser fuel monitor with a non-coalescing filter and install a hand-pumped water draw-off system. - Replace the POL building in kind at its current location and relocate the generator outside the compartmentalized unit. - Named OEM: Veeder Root; upgrade the automatic tank gauging system from a TLS-350 Plus to a TLS-450 Plus. - No separate product quantities are specified; the 12,000-gallon figure describes the existing tank.

Description

This project involves modifying a 12,000 gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled. The POL building is getting replaced in kind at the same location. The ATG system is getting upgraded from a Veeder Root TLS-350 Plus to a Veeder Root TLS-450 Plus. The generator located inside the compartmentalized unit is being moved outside.

View original listing