The City of Aurora is seeking a contractor to demolish a building and complete related utility disconnections and site restoration in Aurora, Illinois. - Government buyer: City of Aurora, Illinois — Purchasing Division; project managed by Engineering. - Location and work: 512 N. Broadway, Aurora. Demolish and dispose of an approximately 6,500-square-foot, single-story wood and light-gauge metal-frame building with a metal roof and slab-on-grade foundation. Remove the slab and footing walls to one foot below existing grade and backfill designated areas to grade with IDOT CA-7. - Utility work: Disconnect the water service at the building, coordinate with the City to confirm the curb-stop shutoff, and leave the end exposed for the City to cap and remove. Disconnect the sanitary sewer service and plug the abandoned pipe with concrete bricks and non-shrink mortar. Electrical and gas services have already been removed. - Bid alternate and unit-priced work: Remove and properly dispose of approximately 8,500 square feet (about 950 square yards) of driveway, walkway, and site pavement. Additional CA-7 site leveling may be ordered if needed. The solicitation also includes an Engineer-directed extra-work allowance; the initial release states a unit price of $15,000, with no quantity specified. - Notable requirements: Dispose of demolished materials at an appropriate facility and comply with prevailing-wage requirements. The asbestos assessment reported no asbestos detected in the analyzed samples, and no lead paint was identified in the solicitation materials; abatement is not included. Treat newly exposed suspect asbestos-containing material as suspect until assessed, and use licensed professionals for sampling or abatement if required. - Named vendor: Clean Air Asbestos and Mold Control, LLC is identified as the firm that performed the asbestos assessment; it is not identified as a required supplier or demolition contractor. No OEMs or required product brands are specified. - Schedule: Begin work no later than 10 calendar days after contract execution and approval; complete the work, restoration, and punch-list items by the solicitation's stated completion deadline.
Description
The City of Aurora is seeking bids to demolish an approximately 6,500-square-foot, single-story wood and light-gauge metal-frame structure with a slab-on-grade foundation and metal roof. Work includes disposal of demolished materials, removal of the slab and footing walls to one foot below grade, backfilling designated areas, disconnecting the water service, and disconnecting and plugging the sanitary sewer service. An alternate covers removal of over 8,500 square feet (approximately 950 square yards) of concrete pavement. Electrical and gas services have already been disconnected, and asbestos and lead-paint testing found neither material; abatement is not required.