Opportunity
Western Area Water Supply Authority Questcdn #10334383
Ely Burntside Lake Water Intake and Pumphouse Construction
Posted
September 29, 2026
Respond By
October 27, 2026
Identifier
10334383
NAICS
237110, 238910, 237990
The City of Ely, Minnesota, seeks one construction contractor for Phase 1 of its Ely Water Supply Project at Burntside Lake. - Government buyer: City of Ely, Minnesota; AE2S is identified as the solicitation agent, not a product vendor. - OEMs and vendors: No product manufacturers or OEMs are named. AE2S is the only named non-government organization. - Requested work and equipment: - Build one lake intake structure and screen with capacity up to 2,000 gpm. - Install approximately 525 linear feet of 16-inch DR11 HDPE gravity transmission pipeline. - Supply and install one 1,000-gpm vacuum-prime-assisted self-priming centrifugal raw-water pump, with a variable-frequency drive and simplex air compressor. - Install buried ductile-iron piping, fittings, valves, and appurtenances; construct concrete equipment pads; and complete electrical improvements and a double-door conversion. - Demolish the existing 400-gpm pump and associated process piping, fittings, valves, and appurtenances; complete grading, shoreline riprap, seeding, and site restoration. - Notable requirements: Bidders must meet Minnesota responsible-contractor and licensing requirements and comply with prevailing-wage rules. A bidder’s bond equal to 5% of the bid is required. AIS and BABA requirements do not apply.
Description
The project is a single-contract construction effort for the City of Ely to upgrade its water supply intake and existing pump station. Work includes demolishing existing pump equipment, installing a new intake structure and screen in Burntside Lake, and constructing approximately 525 feet of 16-inch HDPE pipeline to the shore-side pump station. The scope also includes a new 1,000-gpm raw water pump and associated piping, electrical and structural improvements, and site restoration. Bids are due October 27, 2026, at 10:00 AM local time; bidders must submit a 5% bidder's bond and meet Minnesota responsible contractor, licensing, and prevailing wage requirements.