Opportunity
City of Arlington Ionwave #PWSM27001 Addendum 2
City of Arlington citywide concrete pavement, sidewalk, and ADA ramp replacement
Posted
September 14, 2026
Respond By
October 07, 2026
Identifier
PWSM27001 Addendum 2
NAICS
237310, 238110
The City of Arlington Department of Public Works is seeking a contractor for a citywide concrete pavement, sidewalk, and accessibility improvement program. - Government buyer: City of Arlington, Texas — Department of Public Works, Public Works Engineering. - Opportunity: 2027 Concrete Panel & Sidewalk Replacement Program, Project No. PWSM27001; estimated value $4,682,950. - Work requested: Remove and replace concrete pavement panels, sidewalks, ADA barrier ramps, curbs and gutters, drive approaches, retaining walls, and other concrete features; install asphalt transitions, pavement markings, raised pavement markers, curb drains, and sod at locations across Arlington. - Major quantities: 30,000 SY of reinforced concrete pavement, 1,000 SY of reinforced concrete sidewalks, and 30 ADA barrier ramps in the program quantities. The detailed bid schedule separately lists 750 units of reinforced concrete paving, 30 units of reinforced pavement replacement, 1,000 units of sidewalk, and 20 ADA ramps; the documents do not reconcile these quantities or consistently specify units. - OEM / named manufacturer: Neenah Foundry is named for curb drain part R3262, or equivalent. No other OEMs or construction vendors are identified. - Notable requirements: Prime contractors and applicable subcontractors must be prequalified in the relevant work category. Work must meet ADA requirements and prevailing-wage rules. The solicitation requires a bid security of at least 5% of the largest possible bid total, performance and payment bonds each equal to 100% of the contract price, a two-year maintenance bond, required insurance, and product data or shop drawings before purchase or fabrication. Maintain two-way traffic; road closures are not approved. - Contract duration: Source summaries differ between 270 and 365 calendar days; confirm the controlling duration in the solicitation. No renewal option is indicated.
Description
The project primarily consists of removing and replacing miscellaneous concrete panels, miscellaneous concrete, ramps, and sidewalks throughout the City of Arlington. Work includes concrete pavement, sidewalks, driveways, ADA ramps, and related items as directed by the City. The notice estimates the project at $4,682,950.00 and specifies a 365-calendar-day completion period. Addendum 2 includes the pre-bid agenda, sign-in information, and questions and responses; bidders must meet the stated prequalification requirements.