Opportunity
Georgia Procurement Registry #PE-68250-NONST-2027-000000015
Millen CDBG Sewer, Water, Drainage, and Roadway Improvements
Posted
September 29, 2026
Respond By
October 29, 2026
Identifier
PE-68250-NONST-2027-000000015
NAICS
237110, 237990
The City of Millen, Georgia, is seeking a construction contractor for sewer, water, drainage, and roadway improvements funded through the Community Development Block Grant Program. - Government buyer: City of Millen, Georgia; no sub-agency or specific purchasing office is identified. The project is located in Millen, Jenkins County. - Scope and quantities: - Install approximately 848 LF of 8-inch HDPE sewer main using pipe bursting, replace sewer laterals, and rehabilitate manholes. - Install approximately 530 LF of 6-inch C-900 PVC water main, connect it to the existing system, and install longside and shortside water laterals. - Install approximately 945 LF of 24-inch rollover curb and gutter, 560 LF of 18-inch storm pipe, and 30 LF of 15-inch storm pipe, along with curb and grate inlets. - Perform roadway pavement overlay, sediment control, and grassing. - OEMs and vendors: No pipe or equipment OEMs are specified. Parker Engineering, LLC is identified as the source of plans and contract documents. - Notable requirements: Work must be completed within 120 calendar days. The contractor must hold a valid Georgia Utility Contractor’s license, and work must be overseen by a Utility Manager certification holder. The project also identifies Section 3 participation and BABAA domestic-content requirements, subject to any approved waiver.
Description
The City of Millen is seeking sealed bids for construction work under the 2025 Millen CDBG project. Work includes rehabilitation of sanitary sewer mains, laterals, and manholes; installation of water main and laterals; and drainage improvements, including curb and gutter, storm pipe, inlets, roadway pavement overlay, sediment control, and grassing. The contract completion period is 120 calendar days, and bids are due October 29, 2026, at 11:00 AM ET. Bids must include a bid bond or certified cashier’s check of at least 10% of the base bid, and the contractor must hold a valid Georgia Utility Contractor’s license.