Opportunity
Los Angeles County Lacounty #RFB-IS-27200213
Roof Replacement at Fire Station 028 – Los Angeles County
Posted
September 28, 2026
Respond By
October 12, 2026
Identifier
RFB-IS-27200213
NAICS
238160
This opportunity is for the replacement of the roof on the Fire Department side of Fire Station 028 in Whittier, CA, managed by the Los Angeles County Internal Services Department and Fire Department. - Scope of Work: - Remove and dispose of the existing flat roof system - Install a new 60 mil single ply roofing system (TPO or EPDM) - Acceptable OEMs: John Mansville, GAF, Mule-Hide, or equivalent 60 mil EPDM systems - Replace approximately 15% of roof underlayment - Install vapor barrier, R10 polyisocyanurate insulation (1.5–1.65 inch), fasteners, and TPO membrane - Patch and flash all pipe penetrations; inspect and repair roof penetrations, curbs, and sheathing as needed - Daily cleanup and site maintenance required; contractor must provide own restroom and wash station - Requirements: - Mandatory job walk for bidders - Valid C-39 Roofing and/or B-General Building Contractor's license registered with the State of California - Compliance with California prevailing wage laws and registration with the Department of Industrial Relations - Minimum five-year warranty on both labor and materials - All work must comply with Los Angeles County Fire Department specifications and applicable codes - No specific part numbers are mandated; John Mansville, GAF, and Mule-Hide are highlighted as acceptable OEMs - Project must be completed within ten business days after start, with a final completion deadline specified
Description
This solicitation is for a roof replacement project at Fire Station 028, specifically the Fire Department side only. The project involves removing and disposing of the old flat roof system and installing a new 60 mil single ply roofing system such as John Mansville, GAF, Mule-Hide, or EPDM. The work includes surface preparation, installation of vapor barrier, insulation, fasteners, and membrane, as well as inspection and repair of roof penetrations and equipment. A mandatory job walk is scheduled, and bidders must have appropriate licenses and provide references. The project must comply with prevailing wage laws and be completed by December 31, 2026.