Opportunity

SAM #W912DW27RA017

Conversion of Barracks Buildings into Operational Facilities at Joint Base Lewis McChord

Buyer

Seattle District, USACE

Posted

September 25, 2026

Respond By

October 08, 2026

Identifier

W912DW27RA017

NAICS

238190, 236220

This opportunity from the U.S. Army Corps of Engineers, Seattle District, focuses on converting two barracks buildings at Joint Base Lewis McChord into operational facilities. - Project scope includes: - Hazardous material abatement and removal, especially in crawl spaces - Partial demolition of exterior and interior structures (about 75% of envelope and walls) - Removal of mechanical and electrical systems (about 90%) - Removal of existing EPDM roof system (excluding roof framing) - Installation of new exterior envelope, mechanical and electrical systems - Installation of new Thermoplastic Polyolefin (TPO) roof system - Exterior painting - Site work coordination for utility connections and shared boundaries - No specific OEMs, vendors, products, or part numbers are listed - Contractors must coordinate with adjacent projects for site work and utilities - The project involves both demolition and new construction elements - No estimated contract value or period of performance provided

Description

USACE Seattle District has a requirement to convert two (2) existing barracks buildings into  operational facilities for 3 tier levels of command. These buildings in general are referred as “the  Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade  elevation. The Hammer Heads are single floor. The Basement area with a main utility  mechanical & electrical room extends partially under both the Hammer Head and the Hammer  Handle.

The definitive removal / demolition work items for each building will require:  a) Hazardous material / debris abatement and removal mostly within the crawl space  b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc.  c) Removal at ~ 90% removal of building mechanical – electrical systems  d) Removal of the existing roof EPDM system (but not the roof framing structure)  The definitive repair / new work items for each building will require:  e) New exterior envelope  f) New building mechanical – electrical systems  g) New Thermoplastic Polyolefin (TPO) Roof system  h) Painting of exteriors Other considerations for site work coordination: i) New utility connections (mostly by other entities) j) Shared construction boundaries with adjacent current and future projects

View original listing