Opportunity
SAM #69056727B000002
Olympic National Park Road 107 Bank Stabilization and Riprap Construction
Buyer
Western Federal Lands Highway Division
Posted
September 24, 2026
Identifier
69056727B000002
NAICS
237990, 237310, 238190
This opportunity is for contractors to perform critical road and bank stabilization work at Olympic National Park, managed by the National Park Service. - Government Buyer: - National Park Service, Olympic National Park - Scope of Work: - Bank stabilization and riprap placement along 0.12 miles of Road 107 - Construction of engineered log jams with dolosse for erosion control - Environmental design elements including root wads and textured bank stabilization - Site preparation (clearing and grubbing, mulching, turf establishment) - Installation of temporary traffic control devices (markers, drums, warning lights, pavement markings, construction signs, flaggers, traffic control supervisor) - Products/Materials Requested: - 1400 SQYD clearing & grubbing - 80 boulders - 790 CUYD placed riprap (Class 4) - 260 CUYD placed riprap (Class 5) - 840 SQYD turf establishment - 1600 SQYD mulching - 40 tubular markers, 15 drums, 6 warning lights, 80 pavement markings, 190 pavement marking removals, 6 construction signs - 1000 hours of flagger, 50 days of traffic control supervisor - 6 root wads, 4 engineered log jams with dolosse, 4 engineered log jams with dolosse (textured) - Unique/Notable Requirements: - Use of engineered log jams with dolosse for advanced bank stabilization - Emphasis on environmental design and erosion control - Project located in a sensitive national park environment - No specific OEMs or proprietary vendors are named; materials are standard construction commodities. - Estimated contract value: $2,000,000 to $5,000,000.
Description
Project name and number: WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
This work consists of: Bank stabilization, riprap, engineered log jam with dolosse.
Project Location: This project is located approximately 26 Miles SE of Forks, WA.
Project Length: 0.12 Miles
Estimated Price Range: Between $2,000,000 and $5,000,000
Tentative Solicitation Date: Fall 2026/ Winter 2027
Tentative Fixed Completion Date: Fall 2027
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.