Opportunity
Mississippi Procurement Portal #3170036620
East Tower Roof Replacement at Memorial Hospital at Gulfport (FEMA Hazard Mitigation Project)
Posted
September 23, 2026
Respond By
October 08, 2026
Identifier
3170036620
NAICS
238160, 238190
Memorial Hospital at Gulfport is seeking bids for a FEMA-funded East Tower Roof Replacement project, overseen by the hospital's Engineering Department. - Government Buyer: - Memorial Hospital at Gulfport, Engineering Department (Vice President: Kevin Holland) - Project Scope: - Removal of existing modified bitumen recover roof and underlying built-up roofing down to structural concrete deck - Installation of new modified bitumen roofing assembly with tapered insulation, cover board, flashings, edge metal, penetrations, terminations, and waterproofing components - Raising and modifying rooftop curbs and access thresholds - Elevating and reconnecting seven rooftop condensing/compressor units and one exhaust hood - Providing wind-rated equipment supports and galvanized steel pipe stanchions - Modifying aluminum access stair supports - Coating exterior penthouse CMU walls and weatherizing selected doors - All related structural, mechanical, electrical, hoisting, scaffolding, temporary protection, access, sequencing, and coordination to maintain safe, continuous hospital operations - Facility Requirements: - Risk Category IV essential facility designed for 185-mph ultimate wind speed - Strict adherence to hospital safety, access, and operational continuity - Products/Services Requested: - Modified bitumen roofing assembly (no specific part numbers or OEMs listed) - Wind-rated equipment supports and galvanized steel pipe stanchions - Comprehensive roof removal and installation services - Unique Requirements: - Work must be performed while hospital remains operational - Project resiliency improvements for essential facility - Liquidated damages of $1,000 per day for delays - No specific OEMs or vendors are named in the solicitation.
Description
This solicitation is for the East Tower Roof Replacement at Memorial Hospital at Gulfport, a FEMA Hazard Mitigation Project. The scope includes removal of the existing roof, installation of a new modified bitumen roofing assembly with associated resiliency improvements, and modifications to rooftop equipment and structures. The work must be performed while maintaining safe, continuous hospital operations. A pre-bid conference and site visit are scheduled for September 22, 2026, to assist bidders.