Opportunity
Richmond Planet bids #22240
City of Richmond 7th Street Trash Capture Project: Stormwater Facility Upgrades and Security Enhancements
Posted
September 23, 2026
Respond By
October 15, 2026
Identifier
22240
NAICS
237110, 237990, 238210
This opportunity involves the City of Richmond's 7th Street Trash Capture Project, focused on upgrading stormwater infrastructure for improved environmental compliance and public safety. - Government Buyer: - City of Richmond Engineering & Capital Improvement Projects Department - OEMs and Vendors: - Roscoe Moss (Storm Flo GSRD) - Jensen Precast (Packaged Pump Station System) - Fonroche Lighting America (Smartlight Series) - Ameristar (Aegis II Genesis Style Security Fencing) - Axon (Outpost Solar-Powered Security Camera System) - Products Requested: - 2 Roscoe Moss Storm Flo Gross Solids Removal Devices (GSRDs) - 1 Jensen Precast Packaged Pump Station System - 1 PCP-100 Control Panel Enclosure or approved equal - 1 Fonroche Lighting America Smartlight Series solar streetlight - 1 Ameristar Aegis II Genesis Style ornamental steel security fencing and gate system - 1 Axon Outpost Solar-Powered Fixed Infrastructure Camera (additive alternate) - Notable Requirements: - Installation includes screening assemblies, supports, access components, anchors, security hardware, and full operation and maintenance documentation - Packaged pump station includes cellular monitoring hardware and commissioning - Solar streetlight and security camera systems require delegated design, installation, testing, and commissioning - Ornamental fencing must be 8 feet high with delegated design and warranty - Compliance with Caltrans 2025 standards and City of Richmond specifications - Environmental protection and construction best management practices required - Project completion within 180 working days; liquidated damages for delays - Additive alternate for solar-powered security camera system
Description
The project involves rehabilitation and improvement of an existing stormwater drainage facility within the City of Richmond to construct a stormwater trash capture facility. The work includes selective demolition and removal of existing improvements, installation of two gross solids removal devices (GSRDs), construction of cast-in-place concrete structures, installation of a packaged stormwater pump station and associated electrical facilities, and related site improvements such as drainage, roadway, speed bump, sidewalk, curb ramp, curb and gutter, lighting, signage, fencing, and permanent site stabilization and restoration. An additive alternate is included for installation of a solar-powered security camera system. The project requires compliance with City of Richmond and Caltrans standards and includes various environmental and construction best management practices.