The U.S. Army Corps of Engineers (USACE), Fort Worth District, is seeking industry input for the planned construction of a Squadron Operations and Bomber Generation Squadron Facility at Dyess Air Force Base, Texas. - Government Buyer: - U.S. Army Corps of Engineers (USACE), Fort Worth District - Project location: Dyess Air Force Base, Texas - Project Scope: - Construction of a combined Squadron Operations and Bomber Generation Squadron Facility - Facility size: approximately 167,164 gross square feet - Supports the B-21 program - Construction cost limitation: $164,651,000 - Facility Features: - Two-story construction and high bay maintenance hangar - Reinforced concrete drilled pier foundation and structural steel frame - Masonry and insulated metal panel walls; standing seam metal roof - Interior finishes and special foundation structures for expansive soils - Site Work and Utilities: - Grading, demolition, landscaping, concrete pads, exterior appurtenances - Utilities: water, electrical, sewer, storm water, natural gas, communications - HVAC capacity: 588 tons - Roadways, sidewalks, and parking areas - Requirements: - Compliance with Department of Defense Unified Facilities Criteria - Anti-terrorism/force protection standards - No specific OEMs or vendors are named in the notice - Interested firms should review the Project Information Packet and submit feedback via an online form
Description
SUBJECT: Sources Sought Notice/RFI – B-21: Squadron Ops/Bomber Generation Squadron, Dyess AFB, Texas
DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice.
PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection.
PROJECT DESCRIPTION
This project will construct a combined Squadron Operations and Bomber Generation Squadron Facility at Dyess Air Force Base, Texas, approximately 167,164 gross square, to support the B-21 program, with an estimated Construction Cost Limitation (CCL) of $164,651,000. A portion of this facility will be two-story construction while the remaining portion will be a high bay maintenance hangar. Construction includes reinforced concrete drilled pier foundation, structural steel frame, masonry and insulated metal panel walls, standing seam metal roof and interior finishes. Special foundation structures due to local expansive soils. Site preparation includes site grading, construction site establishment, demolition of existing pavements and demolition of underground utilities within the site. Site improvements include earthwork landscaping, concrete pads and other exterior appurtenances. Utilities include domestic and fire protection water, electrical, sanitary sewer, storm water, natural gas and communications systems, and a 588-ton HVAC capacity. Roadways, Sidewalks and Parking includes new access drives, sidewalks, truck unloading area, Government Owned Vehicle parking areas and Personally Owned Vehicle parking lots.
Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, DoD Minimum Anti-terrorism Standards for Buildings.
INSTRUCTIONS TO INDUSTRY
Review Attached Project Information Packet (PIP): Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference. Submit Responses via Microsoft Forms: To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link: Online Feedback Form: https://forms.osi.apps.mil/r/rvvBByEVkA Response Due Date: All electronic responses must be submitted via the online form no later than October 6, 2026, at 2:00 PM Central Time (CT).
POINTS OF CONTACT
Contract Specialist: Christopher R. Preston II, Christopher.R.Preston@usace.army.mil, (817) 940-2482.
Contracting Officer: Dianne K. Grimes, Dianne.K.Grimes@usace.army.mil, (817) 659-6765
Additional Links:Online Feedback Form (Please review Project Information Packet First)