Opportunity

SAM #W912PP26QA031

Award for Santa Rosa Dam HVAC and Power Stabilization Upgrade

Buyer

USACE Albuquerque District

Posted

September 22, 2026

Identifier

W912PP26QA031

NAICS

238220, 238210

This award notice details a contract for HVAC and power stabilization upgrades at Santa Rosa Dam, managed by the US Army Corps of Engineers, Albuquerque District. - Government Buyer: - US Army Corps of Engineers, Albuquerque District (DEPT OF DEFENSE, DEPT OF THE ARMY, US ARMY CORPS OF ENGINEERS, ENGINEER DIVISION SOUTH PACIFIC, ENDIST ALBUQUERQUE) - Products and Systems Requested: - Three-zone ductless mini-split heat pump system (1 unit) - Single-zone ductless mini-split heat pump system for communications room (1 unit) - Three-phase Voltage Stabilization System (SVS) (1 unit) - Services Requested: - HVAC control system upgrades (programmable thermostats, VFD evaluation/modification) - Electrical distribution upgrades and surge protection coordination - System integration, testing, and commissioning - Temporary power, cooling, and heating provisions - Unique/Notable Requirements: - Fully integrated, code-compliant HVAC and electrical system - Reliable performance under end-of-line utility conditions - No specific OEMs or part numbers provided - Award made as an 8(a) Sole Source Set-Aside under the Small Business Act

Description

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The Contractor shall furnish, install, integrate, test, and commission all labor, materials, equipment, supervision, tools, transportation, programming, and incidentals necessary to provide a complete, fully operational, and code-compliant HVAC, electrical, controls, and power stabilization system at Santa Rosa Dam.  Work includes, but is not limited to:One (1) three-zone ductless mini-split heat pump systemOne (1) single-zone ductless mini-split heat pump system (communications room)One (1) three-phase Voltage Stabilization System (SVS)HVAC control system upgrades, including programmable thermostats and VFD evaluation/modificationElectrical distribution upgrades, surge protection coordination, and system integrationTemporary power and cooling and heating provisionsAll incidental work required for complete and reliable system operationThe Contractor shall deliver a fully integrated system capable of maintaining reliable HVAC performance and stable electrical service under end-of-line utility conditions.

View original listing