This opportunity involves major roadwork on Highway No. 1 in Saskatchewan, focusing on culvert replacement and related environmental protection measures. - Government Buyer: - Ministry of Highways, Province of Saskatchewan - Products/Services Requested: - Supply and installation of two 2,400 mm diameter smooth wall steel pipe culverts (ASTM A252 Grade 2) by sleeving, totaling 199 meters - Removal and disposal of existing culverts (18.8 meters) - Supply and installation of random riprap Type II (250 m³) - Supply and installation of silt fence (150 meters) - Supply and installation of erosion control blanket (1,200 m²) - Seeding (1,200 m²) - Traffic accommodation and mobilization (lump sum) - Installation of a drop provincial structure (lump sum) - Unique/Notable Requirements: - All steel pipe sleeves must meet ASTM A252 Grade 2 standards - Environmental protection plan and compliance are mandatory - Project is divided into two phases with strict completion milestones and liquidated damages for delays - Night work is permitted with applicable fees - Site occupancy and traffic accommodation are required - No specific OEMs or brands are named; bidders must supply compliant steel pipe and materials.

Description

This solicitation is for the supply and installation of two 2,400 mm diameter smooth wall steel pipe culverts by sleeving on Highway No. 1, located 5.52 km west of its junction with Municipal Road No. 605. The total length of the culvert installation is 199 meters. The work includes additional tasks such as removal and disposal of culverts, supply and installation of random riprap, silt fence, erosion control blanket, seeding, traffic accommodation, mobilization, and installation of a drop provincial structure. Completion dates are set for Phase I on March 3, 2027, and Phase II on July 15, 2027.

View original listing