Opportunity
New York State Contract Reporter #RFQ01-SA-SS-2026-005
Hazardous Material Abatement and Ceiling Repair at Saratoga Spa State Park Administration Building
Posted
September 22, 2026
Respond By
October 15, 2026
Identifier
RFQ01-SA-SS-2026-005
NAICS
562910, 238990
This opportunity involves hazardous material abatement and ceiling repair at the Saratoga Spa State Park Administration Building, managed by the New York State Office of Parks, Recreation & Historic Preservation (OPRHP). - Government Buyer: - New York State Office of Parks, Recreation & Historic Preservation (OPRHP), Saratoga/Capital Region - Administration Building, Saratoga Spa State Park - Scope of Work: - Removal of six ceiling-mounted electrical fixtures (two ceiling fans, four linear fluorescent lights) - Terminate wiring and cover electrical boxes per National Electric Code - Abatement of 441 sq ft of 12x12 acoustic ceiling tiles and trace asbestos-containing adhesive glue dabs - Must comply with OSHA 1926.1101 standards for asbestos abatement - Repair, patch, and skimcoat of 441 sq ft of plaster ceiling coated with lead-based paint - Must comply with OSHA Construction Lead Standard 29 CFR 1926.62 and NIOSH 7300 Method for air monitoring - Unique Requirements: - Field verification of dimensions required - Work area containment and protection of alarm detector heads and openings - Maintain a clean state post-work - Minimum bidder qualifications: - EPA Lead Renovation, Repair & Painting (RRP) Certification - New York State Licensed Asbestos Abatement Contractor Certification - Prevailing wage rates apply - Good Faith Efforts to include MWBE/SDVOB vendors must be documented - Air monitoring will be provided by others; coordination required - No specific OEMs or vendors are named; opportunity is open to qualified contractors meeting certifications and requirements.
Description
This solicitation is for abatement and repair work to the plaster ceiling in the Saratoga Spa Administration Building office. The scope includes removal of six ceiling mounted electrical fixtures, abatement of 441 square feet of acoustic ceiling tile containing trace asbestos, and repair, patch, and skimcoat of plaster ceiling coated with lead-based paint. The work must comply with all applicable federal, state, and local laws, including OSHA standards for asbestos and lead paint. Good Faith Efforts are requested to include MWBE/SDVOB vendors where subcontracting is available, and detailed quotes must be submitted on the RFQ form.