Opportunity
SAM #36C25926Q0878
One-Time Repair Service for Bell & Gossett Heat Exchangers at VA Medical Center
Buyer
VHA Network Contracting Office 19
Posted
September 21, 2026
Respond By
October 05, 2026
Identifier
36C25926Q0878
NAICS
811412, 238220, 811310
The Department of Veterans Affairs, Network Contracting Office 19, is seeking a contractor for a one-time heater exchange repair service at the Rocky Mountain Regional VA Medical Center in Aurora, CO. - Government Buyer: - Department of Veterans Affairs - Network Contracting Office 19 - Rocky Mountain Regional VA Medical Center - OEMs and Vendors: - Bell & Gossett (manufacturer of the shell and tube heat exchangers, Model SU 106-2) - Products/Services Requested: - Repair service for six shell and tube heat exchangers (Bell & Gossett Model SU 106-2) - Installation of isolation valves (flanged gate and butterfly valves) - Cleaning, inspection, rebuilding, gasket replacement, and pressure testing - Contractor must provide all labor, materials, supplies, tools, equipment, and qualified personnel - Unique/Notable Requirements: - Restoration of heating system redundancy - All work to be completed within 90 days of award - No specific part numbers provided; focus is on service and maintenance - Leak or pressure testing required to ensure system integrity
Description
The Rocky Mountain Regional VA Medical Center (RMRVAMC) currently supports its heating with shell and tube heat exchangers with a lead and lag redundancy which requires a set of 2 heat exchangers for pre-heat and re-heat, the facility has experienced failures where the gaskets have failed and leaked leaving only one working heat exchanger with the inability to sustain redundancy and limited sustainability of service in case of an outage.The contractor shall Provide all required installation materials, including gaskets, bolting, supports, and appurtenances as applicable. Confirm valve orientation, clearance, accessibility, and operability after installation. Perform leak testing or pressure testing of the affected piping section in accordance with site requirements before returning the system to service.