Nevada Ionwave #PWP-WA-2026-535
Chalk Bluff MCC Improvement Project for Truckee Meadows Water Authority
Posted
September 16, 2026
Respond By
October 07, 2026
Identifier
PWP-WA-2026-535
NAICS
237130, 238210
Truckee Meadows Water Authority (TMWA) is seeking bids for the Chalk Bluff MCC Improvement project at the Chalk Bluff Water Treatment Plant in Reno, NV. - Scope includes: - Replacement of the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building - Replacement of existing 25 kV load-break elbows within transformers, switches, and underground vaults - Replacement of existing fault indicators within transformers, switches, and underground vaults - Installation of concrete aprons at various underground vault locations - All labor, materials, equipment, and incidentals must be provided by the contractor - No specific OEMs or vendors are named in the solicitation - Engineer's estimate for the project is between $99,000 and $121,000 - Work must comply with TMWA's bidding and confidentiality procedures - Project classified as horizontal construction
Government Buyer: - Truckee Meadows Water Authority (TMWA), Reno, NV
Products/Services Requested: - 600A Motor Control Center (MCC) Main Section (replacement) - 25 kV Load-Break Elbows (replacement) - Fault Indicators (replacement) - Concrete Aprons (installation) - Electrical modification and installation services
Unique Requirements: - All work to be performed at the Chalk Bluff Water Treatment Plant - Compliance with TMWA's procedures and confidentiality requirements
Description
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for labor, materials, equipment, and incidentals to modify and replace the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building. The project also includes replacing existing 25 kV load-break elbows and fault indicators within existing transformers, switches, and underground vaults, as well as installing concrete aprons at various underground vault locations. This is a horizontal construction project with an engineer's estimate between $99,000 and $121,000. An optional pre-bid meeting and site visit are scheduled.