Opportunity

Homestead Opengov #301189

Prefabricated Concrete Barrier Wall Installation at Lucy 138kV Switching Station (Re-Bid)

Posted

September 18, 2026

Respond By

October 20, 2026

Identifier

301189

NAICS

237130, 238190, 237990

Homestead Public Services (HPS Energy) is seeking qualified contractors to furnish and install a prefabricated concrete perimeter barrier wall at the Lucy 138kV Switching Station, a key tie-in point for Florida Power & Light (FPL). - Buyer: City of Homestead, Homestead Public Services (HPS Energy) - Scope includes: - Engineering, fabrication, and installation of high-strength precast concrete wall panels (1275 linear feet) - Automated vehicle gate installation - Site clearing, demolition, excavation spoils management, maintenance of traffic, grounding, and site restoration - Mobilization, bonds, insurance, design, engineering, permitting, and delivery of materials - Work must be performed in an energized 138 kV environment; bidders must show documented experience with similar installations at energized electric utility stations - No specific OEMs or vendors are named; opportunity is open to contractors with heavy concrete work experience in industrial or utility settings - All insurance and licensing requirements must be met; responses submitted electronically via the City of Homestead e-Procurement Portal

Description

Homestead Public Services (HPS Energy) is seeking qualified contractors to furnish and install a prefabricated concrete perimeter barrier wall at the Lucy 138kV Switching Station. The project involves installing high-strength concrete barriers to protect the station, which is a critical tie-in point for the Florida Power & Light feeder, against physical threats and environmental damage. The work includes engineering, fabrication, installation, and site requirements in an energized 138 kV environment. Bidders must demonstrate experience in utility station barrier wall installation and meet all insurance and licensing requirements.

View original listing