Opportunity
San Joaquin Transportation Corridor Agency Planet bids #27-R-28-00
Early Demolition Services for Natomas Station and Layover Facility, Stockton, CA
Posted
September 18, 2026
Respond By
October 22, 2026
Identifier
27-R-28-00
NAICS
238910, 562910, 237990
The San Joaquin Regional Rail Commission is seeking qualified contractors for the early demolition of the Natomas Station and Layover Facility in Stockton, CA. - Government Buyer: - San Joaquin Regional Rail Commission - Scope of Work: - Demolition, removal, hauling, and disposal of two buildings at 6362 and 6400 Black Top Road - Hazardous materials abatement, removal, and disposal - Mobilization, project management, and site security (24-hour patrol) - Utility service disconnection, coordination, abandonment, and termination - OSHA pre-demolition engineering survey and structural assessment - Preparation of Injury and Illness Prevention Program (IIPP) and Site Specific Health and Safety Plan (HASP) - Storm Water Pollution Protection Plan (SWPPP) - Final site cleanup and closeout documentation - Removal of existing fence and installation of permanent chain-link fence and gates with slats - Allowances: - Unforeseen conditions - Permits and fees - Engineer-directed extra work - Removal and disposal of vehicles, equipment, parts, and miscellaneous materials - Requirements: - Valid California A and/or B contractor's license required - Mandatory pre-bid meeting - All documents submitted electronically - Project duration is 120 days; liquidated damages of $5,000 per day for delays - Estimated Contract Value: - $300,000 - No specific OEMs or vendors are named, as this is a construction and demolition services solicitation.
Description
This solicitation is for the early demolition of the Natomas Station and Layover Facility located at 949 E. Channel St., Stockton, CA. The project involves demolition, removal, hauling, and disposal of structures at specified addresses, including hazardous materials abatement. The work requires a California A and/or B contractor's license and includes preparation of various plans such as health and safety and storm water pollution protection. The project duration is 120 days with liquidated damages set at $5,000 per day, and a mandatory pre-bid meeting is scheduled.