Opportunity
Garland Ionwave #REQ00002984 Addendum 1
Replacement of 12 Burner Gas Valve Assemblies at Spencer Power Plant, Garland Power & Light
Posted
September 09, 2026
Respond By
September 29, 2026
Identifier
REQ00002984 Addendum 1
NAICS
238290, 811310
Garland Power & Light is seeking a qualified vendor to replace 12 burner gas valve assemblies on Unit 4 at the Spencer Plant in Denton, TX. - Government Buyer: - Agency: Garland Power & Light - Office: Spencer Plant - OEMs and Vendors: - Jamesbury (primary OEM for safety shut-off valve assemblies) - ASCO (solenoids) - Stonel (limit switches) - SSP (Duolok fittings) - F800B (flow control valves) - Products/Services Requested: - 12 Jamesbury 1052 FM Approved Safety Shut-Off Valve Assemblies (FM Model: 1052-7NXQQSA1, Valve: 3" 9150 31 2236 CSAlC, Actuator: QPX4C/MC, Solenoid: ASCO EF8316G054 120/VAC, Limit Switch: Stonel QX4VE02SRA-MET52) - F800B Flow Control Valves - SSP Duolok two-ferrule piece fittings - 1/2" 316 Stainless Steel Seamless Tubing - Piggyback with gauge (part number: 07E32Al8AC) - Installation hardware (studs, bolts, nuts, non-asbestos gaskets) - Electrical connectors (NEMA 4), flex conduit, reducing bushings, and Killary boxes - Services: - Demolition and removal of existing burner gas valve assemblies - Installation, calibration, and testing of new assemblies - Local acceptance testing, final system testing, and documentation - Project meetings, as-built documentation, and project sign-off - Unique/Notable Requirements: - Mandatory pre-bid site visit - All work must be completed within a consecutive 20-day period during the plant outage - Vendor must be able to respond to the Spencer Plant within one hour for call-out activities - Calibration reports, as-built documentation, and support for final system testing are required - All shipping, labor, and materials must be included; valid certificates of insurance required
Description
The City of Garland is soliciting bids for the replacement of 12 burner gas valve assemblies on Unit 4 at the Spencer Power Plant in Denton, TX. The scope includes demolition, installation, calibration, testing, and documentation of the new valve assemblies. The work is to be completed during the Spencer Plant outage from December 1, 2026, to January 31, 2027, within a twenty-day consecutive period. A mandatory site visit is required on September 15, 2026, and bids must be submitted electronically by September 29, 2026.