Opportunity
Missouri BUYS #MODOT SW 0000000050SL,1
MoDOT Southwest District Solicits 500-Gallon Engine-Driven Trailer-Mounted Sprayer System
Posted
September 17, 2026
Respond By
September 22, 2026
Identifier
MODOT SW 0000000050SL,1
NAICS
423860, 423810, 423820
The Missouri Department of Transportation (MoDOT) Southwest District is seeking bids for a 500-gallon, engine-driven, trailer-mounted sprayer system for herbicide application along rights-of-way. - Government Buyer: - Missouri Department of Transportation (MoDOT), Southwest District - Products/Services Requested: - 500-gallon capacity, engine-driven, trailer-mounted sprayer system - Heavy gauge 304 stainless steel tank with compartments - Pump equivalent to John Bean R2020 - Engine equivalent to Honda 13 hp 4-cycle air-cooled gasoline engine with electric starter - Bypass valve, suction strainer, stainless steel paddle agitation, 0-600 psi liquid-filled pressure gauge - Hand sprayer gun included - Approximate trailer dimensions: 109" long x 40.5" wide x 41.5" tall, open air trailer approx. 12-15' long, 9,000 lbs - OEMs Referenced (for specification equivalency): - John Bean (pump) - Honda (engine) - Notable Requirements: - System must meet or exceed listed specifications; alternate brands/models allowed with specification sheets - Delivery timeframe and warranty documentation required - Initial order is for one unit, with potential for additional orders on an as-needed basis - Encouragement of M/WBE and SDV/E participation - Supplier registration in MissouriBUYS and submission of compliance exhibits required - Contract Details: - Firm fixed price, low bid award - Contract period through September 30, 2027, with two one-year renewal options
Description
The Missouri Department of Transportation (MoDOT) Southwest District is soliciting bids for a new 500 gallon, engine driven, trailer mounted sprayer system that meets or exceeds specified requirements. The procurement is on an as needed basis and will be awarded on a firm fixed pricing, low bid basis. The contract period extends from the date of award through September 30, 2027, with two one-year renewal options. An initial order of one unit is planned for Preston Maintenance.