Opportunity
SAM #W912NW26QA053
Allen-Bradley PLC and HMI Upgrade and Installation for Corpus Christi Army Depot
Buyer
U.S. Army Contracting Command
Posted
September 16, 2026
Respond By
September 23, 2026
Identifier
W912NW26QA053
NAICS
335999, 541330, 541512, 238210
This opportunity from the Army Contracting Command at Corpus Christi Army Depot seeks a comprehensive upgrade and installation of Allen-Bradley PLC and HMI systems for three production cabinets. - Government Buyer: - Army Contracting Command, Corpus Christi Army Depot Contracting Office (ACC RSA, W6QK CCAD CONTR OFF) - Chief, Network & Unified Communications Division - OEMs and Vendors: - Allen-Bradley (Rockwell Automation) - Products Requested: - 3 CompactLogix 5380 Controllers (5069-L330ERM) - 8 Digital Input Modules (5069-IA16) - 11 Digital Output Modules (5069-OA16) - 2 Analog Input Modules (5069-IY4 / 5069-IF8) - 3 Pre-Wired 1746-to-5069 Migration Assemblies (Bulletin 1492 Conversion System) - 3 Stratix Managed Ethernet Switches (e.g., 1783-LMS8) - 2 PanelView Plus 7 10-inch Terminals (2711P-T10C22D9P) - 1 PanelView Plus 7 12-inch Terminal (2711P-T12W22D9P) - 3 HMI OEM Mounting Adapter Bezels (Bulletin 2711P Adapter Bezel Mounting Kits) - 3 Industrial 24VDC Cabinet Power Supplies (e.g., 1606-XLP) - All necessary software licenses (Studio 5000, FactoryTalk View ME, ControlFlash Plus, CIP Security) - Services Requested: - Engineering, programming, firmware updates, commissioning, and final acceptance testing - Planning, staging, testing, and coordination for cutovers during scheduled outages - Development of site acceptance test procedures and functional test scripts - Site-specific safety and occupational health plans - Turnkey incidental services: field wire audit, logic refactoring, zero-cutout HMI installation, loop check, live SAT, OT cyber hardening, and training - Unique/Notable Requirements: - Pre-wired conversion assemblies to minimize field wiring changes - HMI adapter bezels designed for zero sheet metal modification - Contractor must provide all software, licenses, and configuration tools - Outage periods coordinated for minimal disruption, with rollback equipment retained onsite until acceptance - Safety and hazard analysis plans required before on-site work
Description
Programmable Logic Controllers (PLC) & Human Interface (HMI) upgrade and Install.