Opportunity
Oregon Buys #S-P00400-00017977
Automotive Department Remodel and Vehicle Lift Replacement for Mt Hood Community College
Posted
September 15, 2026
Respond By
September 29, 2026
Identifier
S-P00400-00017977
NAICS
238350, 238320, 238310, 238390
Mt Hood Community College is seeking bids for a comprehensive remodel of its Automotive Department in Gresham, Oregon. - Government Buyer: - Mt Hood Community College (MHCC) - OEMs and Vendors Mentioned: - Sherwin-Williams (paint) - Shaw (flooring) - Roppe (cove base) - Wilsonart (millwork laminate) - Corian (countertop) - Rotary Lift (vehicle lift) - Products and Services Requested: - Painting entire space with Sherwin-Williams Snowbound SW7004 and Pussywillow SW7643 - Refinishing or replacing epoxy flooring with polished concrete - Installing kitchenette and storage millwork (Corian Modern White countertop, Wilsonart Landmark Wood Grain 7981 laminate) - Replacing classroom carpet with Shaw Gradiant Tile (Graphite) and Roppe black cove base - Upgrading pallet racking for code and seismic compliance - Modifying overhead doors to add glass for natural lighting - Installing AV/display outlets and backerboard for Ford-provided display - Replacing vehicle lift with a new 12,000-lb symmetrical two-post lift (Rotary Lift SPO12 Series or equivalent), including slab thickness verification, electrical, and concrete work - Unique/Notable Requirements: - All work must comply with Oregon Prevailing Wage rates - Contractors are responsible for permits and fees - Mandatory walkthrough required before bidding - Ford will provide equipment specs for AV/display electrical and air system verification - Vehicle lift installation must meet specific slab thickness and anchoring requirements
Description
Mt. Hood Community College (MHCC) is requesting competitive bids from experienced contractors to remodel the automotive department located at 26000 SE Stark St., Gresham, OR 97030. The scope includes painting, epoxy flooring or polished concrete finish, kitchenette and storage millwork, classroom flooring replacement, pallet racking compliance, overhead doors modification for natural lighting, AV/display outlet installation, and replacement of the vehicle lift with a 12,000-lb. symmetrical two-post lift. A mandatory walkthrough is scheduled for September 18, 2026, and bids are due by September 29, 2026. The project requires compliance with Oregon Prevailing Wage rates and all permits and fees are the contractor's responsibility.