Opportunity
CanadaBuys #AB-2026-06308
Arc Flash Studies for University of Alberta Heating and Cooling Plants
Posted
September 15, 2026
Respond By
October 01, 2026
Identifier
AB-2026-06308
NAICS
541330
The University of Alberta is seeking qualified engineering consultants to conduct Arc Flash Studies for its Heating Plant, Central Cooling Plant, and Cooling Plant, all connected to the university's 14.4 kV electrical distribution system. - Government Buyer: - University of Alberta - Facilities Management - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Products/Services Requested: - Arc Flash Studies for equipment operating at 14.4 kV, 4.16 kV, 600 V, 208 V, 120 V, and battery banks above 150 VDC - Comprehensive electrical system analysis for campus facilities - Unique or Notable Requirements: - Analysis must cover multiple voltage levels and high-voltage battery banks - Services must be delivered electronically via the public portal - Contract duration is approximately six months - Technical Scope: - Focus on safety and compliance for high-voltage electrical systems - Includes both plant and distribution system equipment
Description
The University of Alberta is seeking proposals from experienced Industrial and Utility Engineering Consultants to prepare Arc Flash Studies for the Heating Plant, Central Cooling Plant, and Cooling Plant on campus. These plants are connected to the University's 14.4 kV electrical distribution system and include equipment operating at various voltages including 14.4 kV, 4.16 kV, 600 V, 208 V, 120 V, and some battery banks above 150 VDC. The contract duration is estimated to be 6 months, starting approximately on November 2, 2026. Proposals must be submitted electronically through the public portal as per the instructions provided.